price 36.5ton lonking crawler excavator for sale
Negotiable /Unit
Min.Order:1 Unit
Guangzhou Zhongda Machinery Co., Ltd.
Efficiency Rules the Future!
Top Brand Quality!
Reliable and Save 20% Plus!
Chinese Excavator, Hydraulic Excavator, Crawler Excavator, Logistic Equipment, Excavator Manufacturers,
Chinese Crawler Excavator, Chinese Hydraulic Excavator, Chinese Logistic Equipment,
Chinese Excavator Manufacturers, Chinese Logistics Equipment Manufacturers
Original Cummins Engines
Rexroth, Kawasaki Hydraulic System
Roll Over Protective System
Complete line of applications and accessories
Easy maintenance & Outstanding After-sales service
Idler Cushion
The idler cushion with high quality sealing elements effectively guarantee the high pressure sealing inside the cylinder block; the springs are subjected to the special heat treatment to allow the excellent fatigue resistance.
Cab Shock Absorption System
The cab shell is installed to the platform through the cushioning materials consisting of the silicon oil and rubber to relieve the vibration, reduce the noise and guarantee the operation comfort. Cab External Structure
The roof and both sides of cab are reinforced by the steel pipes to enhance the fatigue resistance and damping capacity. The falling object protection structure is bolted to the cab front directly to facilitate removal and consequently enable the machine to adapt to the working conditions and meet the specified safety requirements.
Windows
The glass is clung to the cab directly without frame to enlarge the visual field. The windows allow free adjustment to open/close the front and upper window and windshield; besides, the front glass can be set to the roof above the operator.
Front Wipe
The wiper located in front of cab pillar enlarges the operator’s field of view; it allows the continuous and intermittent operation modes.
Safe and Comfortable Cab
The left/right pillar type reinforced cab complies with 15012117 - 2: 2008 and the optional cab FOPS conforms to 15010262: 1998 to ensure the operator's safety. The 2.7m3 cab space makes the excavator operation comfortable. The reasonable layout of control elements inside the cab allows easy operation.
Standard Cab Equipment
The cab inside includes the cigar lighter, ash tray, cup holder, coat hook, cubbyhole and storage rack, which enhance the operation comfort.
A/C System
The high performance and healthy A/C allows the air circulate. Concise control panel and easy press key operation; multi-direction A/C air outlet allowing fast regulation of cab inside temperature and fast defrosting. The fault self-diagnostics mode facilitates the A/C maintenance.
Deluxe Seat
The comfortable suspension type seat is provided with a hydraulic damper; the wide seatback allows the waist support and the curve profile enables comfortable riding; the double slide track multi-way multi-step regulation enables different operators to find the best posture; the wide pedal space allows the free body stretching and relieves the operator from the long time operation fatigue.
Safety Lock Joystick
The hydraulic safety lock joystick is located at the outside of left armrest box in the cab. The machine control is active only when the joystick is in ON position, which can prevent the wrong operation in an effective way.
Control Lever
The reasonable design of control lever saves the operating effort by the lever principle; the ergonomic design enables the operator to maintain the natural wrist and arm posture. The moderate joystick stroke relieves the degree of fatigue and ensures the accurate control.
Switch Control Panel
The control panel on the left/right pilot box is in concise and esthetic layout and the operation of keystroke is easy.
Boom and Arm
To cope with high load during operation, the design & development team of LONKING adopts more conservative design philosophy, preserves the higher safety factor, employs finite element analysis, calculation and optimum design to finish the development of boom and arm and selects the high strength low alloy structural steels for the boom and arm fabrication.
Pin Shaft
The pin shaft is the core element for the connection of the working device. LONKING chooses the professional pin shaft suppliers and subject the pin shafts to the strict fault detection to ensure the quality. The pin shaft of LONKING excavators has thick chrome plating coat and high surface finish. The special treatment enables the extremely high wear resistance and corrosion resistance.
Bucket
The bucket body is made of low alloy and high tenacity materials and the external structure is made of high strength and wear-resistant steels, which constitute the entire reinforced bucket. This excavator provides different bucket options to meet different working demands.
Easy Maintenance and Service
The design and layout of CDM6365H has taken the providing convenience for maintenance person into consideration. Most maintenance locations can be accessed from the ground level to enable the fast and high efficiency maintenance. 3 side doors can be opened during the routine inspection and maintenance and each service point is within the easy reach. The maintenance points are clearly identified, easy to operate. The electrical elements are centralized in the electromechanical control box in the cab to facilitate the maintenance.
Long Maintenance and Service Cycle
The maintenance and service cycle of CDM6365H has been prolonged to reduce the maintenance parts collection and enhance the availability
Specifications | CDM6365H | |
Engine | Model | Cummins6C8.3 |
Rated power | 197kW (265hp) /1950 rpm | |
Max. torque | 1219/1300 | |
Bore× Stroke | 114mm × 135mm | |
Displacement | 8.3 L | |
Comment | Maintain the rated power at 2300m elevation. | |
Operating weight | Summary | Operating weight:34000kg The operating weight includes the weight of 6470mm standard boom, 2900mm standard arm,1.6m3 standard bucket,600 mm track,lubricating oil, coolant, the full diesel oil tank and the rest standard configuration units. |
Ground pressure | 68 kPa (Lengthened type:70kPa) | |
Fluid capacity | Fuel tank | 580 L |
Cooling system | 33 L | |
Engine oil | 35 L | |
Swing drive unit | 7.2 L | |
Traveling gear | 2×11 L | |
Hydraulic oil tank | 530 L | |
Swing mechanism | Summary | High torque plunger motor and 2-stage planetary reducer drive.Brake inside loading motor is applied by spring and released by hydraulic unit. The automatic braking is available when the swing control lever is in neutral position. |
Swing speed | 9.5 rpm (Lengthened type:7.5 rpm) | |
Travel drive | Summary | The integrated 2-speed plunger hydraulic motor and reducer drive, motor and hydraulic pipeline are arranged inside the track frame to prevent the damage caused by the rugged road surface; The motor inside is provided with the service brake and shock absorption valve to ensure the smooth running and stop and the reliable braking. |
Taveling speed | 3.25 - 5.43 km/h | |
Gradeability | 35°(70%) | |
MaximumTraction | 298kN | |
Traveling mechanism | Standard track shoe width | 600 mm |
No. of track shoes | 48 (each side) | |
No. of carrierrollers | 2 (each side) | |
No. of track rollers | 8 (each side) | |
Hydraulic system | Main pump | Duplex axial variable plunger pump |
Pilot pump | Gear pump (integrated in main pump) | |
Max. flow of system | 2×340 L/min | |
Max. pressure of equipment | 34.3 MPa | |
Max. pilot pressure | 3.9 MPa | |
Operating equipment | Each machine action is under the pilot control. The right lever controls the motion of boom and bucket while the left lever controls the arm motion and upper structure swing. The foot pilot valve is provided with the lever joystick to control the machine traveling or turning by the foot or lever. The traveling gear shift adopts the solenoid switch control. | |
Electrical system | System voltage:24 V Battery:12 V,120 A×2 |