Customizable 7 Inch Android RJ45 POE Tablet For Automation Controlling
Negotiable /Piece
Min.Order:1 Piece
Shenzhen Sibo Industrial & Development Co., Ltd.
Customizable 7 Inch Android RJ45 POE Tablet For Automation Controlling
Interface:
RJ45 (Power over ethernet POE)
Network:
Mount:
Customized Service:
Model Number | Q896 | |||
Hardware Specs | Solution | Allwinner Dual-Core Cortex™-A7 CPU | ||
CPU | ARM Cortex A7 Dual-Core, 1.2GHz | |||
Display | 7 Inch IPS Display, Resolution:1024 x 600, Brightness: 350 cd/m2 | |||
RAM | 1GB | |||
Nand Flash | 4GB | |||
Software Feature | System | Google Android 4.2.2 | ||
Video | H.264 2160p video decoding, Multi-format FHD video decoding, including Mpeg1/2, Mpeg4 SP/ASP GMC, H.263, H.264, VP6/8, AVS jizun, Jpeg/Mjpeg,etc. H.264 High Profile 1080p@30fps or 720@60fps encoding 3840 x 1080@30fps 3D decoding, BD/SBS/TAB/FP supported Complies with RTSP, HTTP, HLS, RTMP, MMS streaming media protocols | |||
Audio | Integrated 3W Amplifier (No Speakers, Only Speaker connector) | |||
Language | Support multi-languages | |||
Interfaces | Back | Ethernet Interface(RJ45) | ||
HDMI Out | ||||
USB Socket | ||||
CVBS IN | ||||
DC IN Power Terminal (9V-24V) | ||||
UART, IO, 3W AMP OUT Available | ||||
Network | WIFI+BLUETOOTH | WIFI (802.11b/g/n), Bluetooth v2.1+EDR/Bluetooth 3.0/3.0+HS/4.0 | ||
LAN Port | Ethernet RJ45 | |||
Power Supply | DC IN | DC 9V - 24V | ||
Boot Up | Auto Boot | Auto Boot Up When Power Supplies | ||
Software | Auto Run Web App |
Package:
Devices are packed by air column bag, 16 devices in one carton box
Carton Size:55*36*24cm
Gross Carton Weight: 7.5 kg
Shipping:
Sample lead time: 5-7 working days
Order>100 pcs: 20-25 working days
Sample shipped by express (DHL, TNT, UPS)
Hardware and software support:
Modification on both hardware and software to meet your requirements
After sale service:
Instant response to all your questions
Found in the year of 2001 and have ability of design, research & development, production
Professional production line: Dust-free
Ageing test for more than 6 hours before final full function check:
Engineer Check on production line: