plastic single wall corrugated pipe machine
USD $10,000 - $30,000 /Set
Min.Order:1 Set
Joy Plastic Machinery (Qingdao) Co., Ltd.
plastic single wall corrugated pipe machine :
Description for the machine/ PVC corrugated pipe extrusion line with steel wire passing inside
1) material for the single wall corrugated pipe :
This production line can be used to produce corrugated pipes of PE,PP,PVC,EVA continuously,as well as PA corrugated pipes
2) application for the single wall corrugated pipe:
Plastic single-wall corrugated pipes have feathers of high temperature resistance,resistant to corrosion and abrasion,high intensity,good flexibility,etc.
They are widely used in fields of auto wire,electric thread-passing pipes,circuit of machine tool,protective pipes of lamps and lanterns wire,tubes of air conditioner and washing machine,etc.
3) advatanges
SJDBGZ seies plastic single-wall corrugated pipe production line developed by our company adopts gears to run modules and templates so as to realize water circulating cooling and air cooling of the products,which ensures high-speed molding,even corrugation,smooth inner and outer pipe wall.
These corrugated pipes are especially used as wires of the up-market cars.
4) Machine parameters show:
Pipe diameter range(mm) | 4.5-9 | 9-32 | 32-50 |
Main machine model | SJ-30 | SJ-50 | SJ-65 |
Main machine l/d | 30:1 | 30:1 | 30:1 |
Production capacity kg/h | 10 | 40 | 80 |
Main motor capacity kw | 4 | 11 | 18.5 |
Moiding machine capacity kw | 1.1 | 1.5 | 1.5 |
Pair of modules | 42 | 50 | 50 |
Cooling mode | Water cooling and fan cooling | ||
Production (m/min) | 6-10 | 8-12 | 8-15 |
Metering mode | inductiing mode | ||
Coiling machine mode | Motor-drivenManually-operated | ||
Pipe mold quantity | 42 pairs 62 pairs 68pairs | ||
Winder control | frequency converter control(better than torque motor control) | ||
FOB QINGDAO PRICE(Include 1 set mold) | |||
CBM | 8CBM 16CBM 23CBM | ||
load into container | whole 20 feet container | ||
Port of Delivery | Qingdao Port( China) | ||
Delivery Term | 35 days after received 30% down payment by T/T | ||
Guarantee | 12 months after the clients installation | ||
Installation and Test | can send the technicians to client's factory for install and testing, the buyer need to pay the tickets fee,accommodation fee, also need to pay 50USD per day per technician. | ||
Machine working life | 5-10 years | ||
Exported Countires | Middle East, Africa, South America, Southeast Asia, Turkey,Russia and other countries
|