solenoid release hydraulic gantry lift
Negotiable /Set
Min.Order:1 Set
Shanghai Fanyi International Trading Co., Ltd.
Features:
1. Manual one side lock release system
2. clear floor design make under-vehicle service more convenient
3. Optional 24V power control box considers safety operation
4. Top limited switch effectively avoid unexpected injuries and damages
5. Dual hydraulic cylinder drive, stable lifting and lowering
6. Adopt two steel cables for equalization, force two carriages to move synchronously
7. It has been proofed by dynamic test with 125% of rated capacity and static test with 150% of rated capacity
8. CE certificate
Technical Parameter
Specification | Capacity | Lift Height (mm) | Rise Time | Drop Time | Power of Motor | Power Supply | Width of the Rack (mm) | Height of the Rack (mm) | Width Pillars (mm) | Net Weight (kg) |
3.0/4.0T | >=1700 | <50s | >20s | 2.2kw | 380/220v | 3435 | 3680 | 2900 | 780/820 |
Model | QJY3.0-D4 | |
Total Height | 3708 mm | |
Lifting/Dropping Time | ≈50s | |
The Maximum Lifting Height | ≥1700 mm | |
Minimum Height of Rubber Pad | 125mm | |
Adjusting Range of Rubber Pad | 125~140 mm | |
Adjusting Range of Arm | 758~1138 mm | |
Width Between Pillars | 2900 mm | |
Width of the Rack | 3432 mm | |
The Biggest width for passing the vehicle | 2660 mm | |
Rated Load | 3000 kg | |
Motor Power | 2.2 kw | |
Working Voltage | 3~380V+N+PE | 3~380V+N+PE |
Noise Level | ≤75dB(A) | |
Oil Pressure | 20MPa |
Warranty
We aim to provide the best parts warranty for our customers.
We offer 12 months parts warranty and require photographic proof or the item to be sent back to our workshop for assessment and review.
Our warranty does not cover the followings :
1.Intentional Misuse
2.Not following maintenances chedules and accidents out of the human control
3.Freight is at the buyers expense
4.All warranty claims will be attended promptly and in a professional manner
1.FAQ......About Delivery Term
Q…What’s the delivery term for making business with us?
A…Usually we send the shipments in FOB term.However,the terms of CIF and C&F are acceptable which depend of clients.
2.FAQ......About Delivery Time
Q…What’s the delivery time after placing the order?
A…Usually it takes about 20-30days after we received your down payment.However,it would depend on our production line schedule(the timing clients place order)and the complication of the item.
3.FAQ......About Payment Term
Q…What’s the Payment Term?
A…By T/T, 30% previous payment and 70% balance payment before shipping or copy of Bill.
4.FAQ......About Min Order
Q…What’s the Min order to your company?
A…1 set.The sample order, if we have stocks, we will send out the products within 1 week.
5.FAQ......About Advantage
Q…What’s the advantage of your company?
A.....We have exported our lifts and service to more than 50 countries./ we have speclized team work for you, you will get our feedback within 12 hours./ Germany and Italian advanced manufacturering technology