Chinese Embroidered Hotel Terry slipper
USD $0.13 - $3.5 /Pair
Min.Order:1000 Pairs
Yangzhou G&P Technology Development Co., Ltd.
Chinese Embroidered Hotel Terry slipper
Upper Materials | a) Terry cloth ; b) velvet ; c) Waffle ; d) Non-woven |
Sole Material | EVA,TPR,EVA with beaded cloth,sponge,EVA covered with synthetic leather |
Sole Thickness | 1.5mm,3mm, 4mm,5mm,5.5mm, 6mm or as your request |
LOGO | Screen printing , hot-transfer printing , normal embroidery ,gold embroidery , silver embroidery , sewing label , printing label or as your request |
Slipper Types | a. Open toe and closed toe styles slipper ; b. Women or men size, or on fits all slipper d. With embroider or not slipper |
Slipper's Color | Such as white, blue, blue, red, grey, black and so on. we can do as your request |
Size | 27cm*10.0cm;28cm*10.5cm;29cm*10.5cm;29.5cm*10.5cm; 30cm*10.5cm.31cm*11.0cm;32cm*11.5cm or as your request for your slipper |
Inner Sponge Thickness | 1mm,2mm,3mm,4mm,5mm. |
Packing Details | Non-woven bag , organza bag , cotton bag |
If you are interest in our products or our services, please contact us, you will get the best reliable products in reasonable prices.
Q: Are you a factory or trading company?
A: We are a factory with export license.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in Yangzhou City, Jiangsu Province, China, about 4 hours bus ride from Shanghai .All our clients, from home or abroad, are warmly welcome to visit us!
Q: Can you do OEM?
A: Yes, we can do OEM products. It's no problem.
Q: How can I get some samples?
A: 1, We are honored to offer you samples. New clients are expected to pay for the courier cost, the samples are free for you,this charge will be deducted from the payment for formal order.
2,Regarding the courier cost: you can arrange a RPI (remote pick-up) service upon Fedex, UPS, DHL, TNT, etc. to have the samples collected; or inform us your DHL collection account. Then you can pay the freight direct to your local carrier company.
Q: How does your factory do regarding quality control?
A: "Quality is priority? We always attach great importance to quality controlling from the very beginning to the very end:
1.All raw material we used are environmental-friendly;
2.Skilful workers care every details in handling the producing and packing processes;
3.Quality Control Department specially responsible for quality checking in each process.