Galvanized Perforated Metal lvl scaffolding plank for construction
USD $8.15 - $9.27 /Piece
Min.Order:2000 Pieces
Tianjin Youfa International Trade Co., Ltd.
Galvanized Perforated Metal lvl scaffolding plank for construction
1. Description of lvl scaffolding plank
steel plank can replace timber or bamboo plank, construction workers can walk on that.There
are many different sizes and materials of the steel plank, we can make that products according
to the customer's requirements
1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
2. We can supply all kinds of lvl scaffolding plank with hole and without hole
Thickness | 1.0 | 1.1 | 1.2 | 1.5 | ||||
Specification | open type | close type | open type | close type | open type | close type | open type | close type |
210*45*1000 | 3.09 | 3.18 | 3.36 | 3.45 | 3.62 | 3.71 | 4.41 | 4.50 |
210*45*1500 | 4.50 | 4.68 | 4.89 | 5.07 | 5.29 | 5.47 | 6.48 | 6.66 |
210*45*2000 | 5.90 | 6.17 | 6.43 | 6.70 | 6.96 | 7.23 | 8.54 | 8.81 |
210*45*2500 | 7.30 | 7.67 | 7.97 | 8.33 | 8.63 | 8.99 | 10.61 | 10.97 |
210*45*3000 | 8.71 | 9.16 | 9.50 | 9.95 | 10.30 | 10.75 | 12.67 | 13.13 |
210*45*4000 | 11.52 | 12.15 | 12.58 | 13.21 | 13.63 | 14.27 | 16.80 | 17.44 |
240*45*1000 | 3.38 | 3.49 | 3.67 | 3.77 | 3.96 | 4.06 | 4.82 | 4.93 |
240*45*1500 | 4.92 | 5.12 | 5.35 | 5.56 | 5.78 | 5.99 | 7.07 | 7.28 |
240*45*2000 | 6.45 | 6.76 | 7.02 | 7.34 | 7.60 | 7.91 | 9.33 | 9.64 |
240*45*2500 | 7.98 | 8.40 | 8.70 | 9.12 | 9.42 | 9.84 | 11.58 | 12.00 |
240*45*3000 | 9.52 | 10.04 | 10.38 | 10.90 | 11.24 | 11.76 | 13.83 | 14.35 |
240*45*4000 | 12.58 | 13.31 | 13.73 | 14.46 | 14.89 | 15.61 | 18.34 | 19.07 |
250*50*1000 | 3.56 | 3.67 | 3.86 | 3.97 | 4.17 | 4.28 | 5.08 | 5.19 |
250*50*1500 | 5.18 | 5.39 | 5.63 | 5.85 | 6.09 | 6.30 | 7.45 | 7.67 |
250*50*2000 | 6.79 | 7.12 | 7.40 | 7.72 | 8.01 | 8.33 | 9.83 | 10.15 |
250*50*2500 | 8.41 | 8.84 | 9.17 | 9.60 | 9.93 | 10.36 | 12.20 | 12.64 |
250*50*3000 | 10.02 | 10.56 | 10.93 | 11.48 | 11.84 | 12.39 | 14.58 | 15.12 |
250*50*4000 | 13.25 | 14.01 | 14.47 | 15.23 | 15.68 | 16.44 | 19.33 | 20.08 |
3. Product: Galvanized Perforated Metal lvl scaffolding plank for construction
4. Packing & Loading
5. Suggestion:
Please kindly check the packages after you receive the goods, if you got wrong productsbquality problem/ short q'ty, please get back to us as priority. Please note that you need to send us pictures of the defective items concerning this, and we will consider to replace or refund accordingly.
6. Our Service:
• Your inquiry related to our product & price will be replied within 24hours.
• Well-trained & experienced staff are to answer all your inquiries professional in English of course.
• Working time: 8:00am - 5:30pm, Monday to Friday.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question.
Galvanized Perforated Metal lvl scaffolding plank for construction