metal sintered parts
Negotiable /Piece
Min.Order:2000 Pieces
Shanghai Ninefold Import Export Co., Ltd.
/ stamping of sheet metal parts
Our stamping parts include: stamping part, stamping, metal stamping, automotive part, stamping die, precision mould, die stamping, automotive stamping
Feature: | |
Design: | We use the most advanced mould design software Auto CAD, Pro/E, Solidworks, UG (dwg, dxf, IGS, STP, X-T) |
Manufacture: | We use With advanced technology, unmatched skill, professional and advanced equipment size range from 15T-160T, and experienced technicians to fit our customers requirements, like tooling manufacturing, stamping and surface treatment service |
Cavity/core material: | DIN1.2344, 738H, 718, 8407, S136, NAK80,P20, SKD-61, NIMAX etc |
Product Material: | Stainless steel, carbon steel, cold rolled sheet, aluminum, brass, and so on |
Making process: | Progression die, Stamping, deep drawing, Bending, Punching, Threading, Welding, Tapping, Riveting, Grinding, CNC machining |
Surface treatment: | Anodizing, Powder-Coating, Zinc-Plated, Chrome coated ,Nickel Plated ,Hex Chromates Zinc, Rust-inhibiting oils, Electrophoresis, Paints and primers, blacking, etc |
Price Terms: | FOB, Shanghai, China |
Lead time: | 25-50days based on the different products |
Packaging: | canton case or as per customers’ requirement |
Certification: | ISO9001:2008 |
Industry: | these parts are used in Automotive, Electrical, Building, Furniture, Machine assembly, Computer, Air industry. OEM/ODM Electronics |
OEM orders are welcomed, for any stamping part |
MOULD SERVICE PROCESSING | |
Drawings | 1, Received the 2D or 3D drawings and the technical requirement, we will give the quotation with delivery time as per your requirements. |
Sales Contract | 2, Sign the Mould Design and Manufacture Contract between two parties after receiving your production confirmation. |
Design Work | 3, We will start the design work (for this please send 3D drawings if possible, our specialists will be more efficiently work out the design with CAD/CAM/CAE systems) |
Mould | 4, We will give the mould drawings within 15 days (depending on the structure of the product), and we start the manufacture after your approval. |
Samples | 5,Then will be the first test, we will send you the samples injected by the ordered mould. |
Modification | 6,Mould modification until the customers satisfy it. |
Delivery | 7, We will delivery the mould after the above mentioned working process |
Smal order can be accepted!
Our other products photos:
Our workshop overview:
Our factory have 25 sets of common punching press machines with 16 tons to 160 tons, 2 sets of hydraulic machine with 200 tons, made in Taiwan, and 1 set of hydraulic machine with 500 tons, made in Japan.