Continious Automatic used lubricants oil recycling plant
USD $40,000 - $60,000 /Set
Min.Order:1 Set
Xinxiang Huayin Renewable Energy Equipment Co., Ltd.
Welcome to Huayin, the Best Manufacturer of Waste to fuel plant! | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1. 3D Flow Chart of Waste to fuel plant | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2. The Waste to fuel plant working process feed crude oil -- heat(reactor)-- cooled down(condenser)-- get oil(oil tank)--waste flammable gas to reheat reactor pump oil-- oil refining system--separate oil and catalyst( vibration filter)—storage tank--oil decloring tank-- get oil like diesel(oil tank) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3. Safety 1) Auto welding, X-ray detection room is special for welding seam test 2) 1 set of safety valves+ 4 temperature gauges+ 3 pressure gauges= security system 3) Water seal shall prevent backfire and special design can reduce corrosion to reactor 4) Waste flammable gas reheat the reactor, guarantee safety | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4. Energy Saving 1) The whole reactor can be heated, so the raw material can be fully pyrolysis 2) Fire road is designed as spiral, fuel shall be fully burned 3) Both condenser and cooling pool are ok 4) Special design for gas separate to seep up pyrolysis process | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5. High profit
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6. Brief Introduction of Waste to fuel plant 6.1 Model and Specification
6.2 High Configuration @ The material of the reactor is Q345R boiler steel with 16 mm thickness @ Stainless steel material for the tube of the gas burner @ Stainless steel material for draft fan 6.3 Delivery Time 10 days after deposit receiving 6.4 Shipment container
6.5 FOB Port(China) Qingdao, Tianjin...or according to your requirement 6.6 After Service 1) Foundation drawing shall be sent to you after contract signing 2) Send engineer to installation and give you instruction 3) CE, ISO, TUV,BV, SGS and patent certification 4) 1 year warranty 5) we will inform you our new technology | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7. Picture Show |