Clamp for pvc pipe zinc M6-10
USD $0.16 - $0.65 /Piece
Min.Order:100000 Pieces
Hebei Dingsu Plastic Sales Co., Ltd.
1)Material :galvanized iron sheet or Stainless steel or PVC
2)Size:20-200mm,1/2"-8"
3)Thickness:0.4-3.0mm
4)Width:16-30mm
5)Locking Screw:Conbi-slot cheese head screw
6)Acoustic Insulation lining:Materi:EPDM:chlorine-free:silicone-free
7)Temperature range: -50° to +110°
8)Hardness: 45+-5° Shore
Information of product
1.Galvanized iron sheet with rubber for PPR pipe,PVC pipe,PE pipe,Plastic pipe,other pipes
2.Galvanized iron sheet without rubber for PVC pipe,PPR pipe,PE pipe,Plastic pipe,other pipes
3. Stainless steel for PVC pipe,PPR pipe,PE pipe,Plastic pipe,other pipes
4. Nail
Dim(mm) | ¢ mm | Inch | Connection Nuts | Band/mm | PCS /CTN | Volume/Ctn (m3) |
¢18 | 15-19 | 3/8" | M6,M7,M8,M10 | Width: 16,20;25;28;30 Thickness: 0.4,0.8;1.0;1.2;1.5;2.0; 2.5;3.0 | 600 | 0.023 |
¢ 22 | 20-25 | 1/2" | 600 | 0.023 | ||
¢ 28 | 26-30 | 3/4" | 600 | 0.023 | ||
¢35 | 32-36 | 1" | 400 | 0.023 | ||
¢ 40 | 38-43 | 1 1/4" | 400 | 0.023 | ||
¢ 48 | 47-51 | 1 1/2" | 300 | 0.023 | ||
¢ 54 | 53-58 | —— | 200 | 0.023 | ||
¢60 | 60-64 | 2" | 200 | 0.023 | ||
¢70 | 68-72 | —— | 100 | 0.023 | ||
¢75 | 75-80 | 2 1/2” | 100 | 0.023 | ||
¢83 | 81-86 | —— | 100 | 0.023 | ||
¢ 90 | 87-92 | 3" | 100 | 0.023 | ||
¢100 | 99-105 | 3 1/2" | 50 | 0.023 | ||
¢110 | 107-112 | —— | 50 | 0.023 | ||
¢115 | 113-118 | 4" | 50 | 0.023 | ||
¢125 | 125-130 | —— | 50 | 0.023 | ||
¢133 | 132-137 | —— | 50 | 0.023 | ||
¢140 | 138-142 | 5" | 50 | 0.023 | ||
¢150 | 148-152 | —— | 25 | 0.023 | ||
¢160 | 159-166 | 6” | 25 | 0.023 | ||
¢200 | 200-212 | —— | 25 | 0.023 | ||
¢ 220 | 215-220 | 8“ | 25 | 0.023 | ||
¢ 250 | 248-252 | —— | 25 | 0.023 |
Used for mounting of pipes to the walls ( vertical / horizontal ) , ceilings and floors
For Suspending Stationary Non-Insulated Copper Tubing Lines
Being fasteners for pipe lines such as heating, sanitary and waste water pipes;to walls, ceilings and floors.Side screws are protected against loss during assemble with the help of plastic washers
Installation
Insert pipe, press together clamp parts, tighten locking screws
Pictures Show
Warehouse
New products
1.special chanli tube high-rise building drainage system and the toilet shifter
2.The same floor drainage system
Questions and answers:
♥ How is the quality of your products?
Our products are manufactured strictly according to national and internaional standard,
and we take a test on every pipe before delivered out. If you want see our quality certifications
and all kinds of testing report, please just ask us for it.
♥ How about price?
Yes, we are factory and be able to give you lowest price below market one,
and we have a policy that " for saving time and absolutely honest business attitude,
we quote as lowest as possible for any customer, and discount can be given according to quantity",
if you like bargain and factory price is not low enough as you think, just don't waste your time.
Please trust the quotation we would give you, it is professional one.
♥ Why choose us:
1. We produce parts by ourselves, which makes more competitive price and faster delivery;
2. We provide OEM / ODM service and submit Various styles, latest designs to our clients;
3. We work with big customers in Southeast Asia,Africa,Middle east,South America;
4. We have great experience on provide high quality service to clients;
5. Welcom to visit our factory.
Our service formula: good quality+good price+good service=customer's trust
Any doubt please contact Us.