China CBRL Rubber Boot For Cable Copper Wire Tin-Coated Bare Copper
USD $0.05 - $0.25 /Meter
Min.Order:3000 Meters
Yueqing Rixing Cable Technology Co., Ltd.
450/750V Five Cores Flexible Copper Rubber Cable used in Coal Mine/Mining
Top Quality 25mm 35mm 50mm 70mm 95mm 120mm 150mm Rubber Insulated Fexible Wire Rubber Cable Price
Round or flat jacket single core/2cores/3cores/4cores PVC insulated cables Quality Choice
silicone rubber coated flexible wire electronic equipment tinned copper stranded wire
magnet wire manufacturers silicon insulated coated wires and cables
Type Code | XL-005A |
Conductor | Carbon Fiber 3K |
Insulation | Silicone Rubber |
Resistance | 130 Ω/m |
Overall-diameter | 2.5mm |
Color | White/Yellow/Red |
Heating cable advantages:
1)Electric heat tracing temperature uniform,no overheating,safe and reliable
2)Energy saving
3)Intermittent operating.temperature rise quickly
4)Low charges of installation and working
5)Easy maintaining
6)Automated management
7)No pollution
8)Heating cable is suitable for complex pipeline
9)Heating cable is suitable for long pipeline
10)Heating cable is suitable for instrument box
1. About Us
RI XING CABLE TECHNOLOGY CO.,LTD as the professional manufacturer of cable- PVC wire, heating cable, silicone rubber wire, high temperature wire, cable reel,has its humble beginnings in 2007 when it was established inWenzhou China by our Managing Director- Mr. Heman. |
2. Why Choose Us
1.How long will it take for the underfloor heating system to warm up?
The warm up time of an electric underfloor heating system will be dictated by the insulation used beneath it and the output of the system. In general, the better insulated the sub-floor the faster the system will warm up, with Underfloor Insulation boards?facilitating a very speedy warm up time of as little as 15 minutes, and un-insulated concrete floors causing the slowest warm up time. Using a?200W system?beneath ceramic/stone tiles provides a faster warm up time than 150W system. |
2. Can I turn my heating on the day it is fitted?
If you have installed your heating beneath tile adhesive, levelling compound or a screed you must allow this to dry out before turning on your system for the first time. If the system is turned on too early it will force the moisture out of the covering which may lead it to crack. We would recommend speaking to the manufacturer of your flexible tile adhesive, grout or screed to confirm the drying time required. |
3. Does each room require its own thermostat?
We would recommend that each room has its own heating system controlled by its own thermostat. This will allow for simpler and more accurate temperature control of each room and will avoid heating rooms which do not require it. |