scaffolding steel pipes/tube made in china
scaffolding steel pipes/tube made in china
scaffolding steel pipes/tube made in china
scaffolding steel pipes/tube made in china

scaffolding steel pipes/tube made in china

USD $325 - $549 /Ton

Min.Order:5 Tons

Supply Ability:
5000 Ton / Tons per Month
Port:
Shanghai Tianjin
Payment Terms:
T/T L/C D/P D/A Credit Card

Quick Details View All >

Thickness:
1.5, 20
Section Shape:
Round
Outer Diameter:
0.5 - 10 inch
Place of Origin:
Shanghai, China
Secondary Or Not:
Non-secondary
Application:
Other, gas pipe/ fluid pipe/ structure pipe

Shanghai Changzeng Metal Co., Ltd.

Business Type: Trading Company
Shanghai China
Main Products: Galvanized Angle ,Steel Channel ,Rectangular Pipe ,Rebar ,Flat Steel Plate

Product Details

Product Description

Product Name scaffolding steel pipes/tube made in china
Outer Diameter

Seamless pipe: 1/2"-24"(DN15-DN600,OD21.3mm-OD609.6mm)

API Line pipe:1/8”-48"inch, DN6~DN1200

Welded pipe:1/2”-60"inch

Thickness

sch10, sch20, sch30, std, sch40, sch60, xs, sch80, sch100, sch120,

sch140, sch160

Length3.0m,5.8m,6.0m,11.8m,12.0m or as requirment
Materials

Q195, Q215, Q235, Q235B, Q275, Q345B

S235, S235jr, S355, S355jr

SS400, SS330, SPHC

St37, St52,  A53

Standard

GB-T3091,BS1387,ASTM A53,GB-T14980,JIS3444

Technique

hot rolled,  welded(erw)

Payment terms

LC at sight,30%T.T in advance,balance after the copy of B/L or

Alibaba Trade Assurance

Packing

1. In Bundle

2. In Bulk

3. PE clothes packed

4. As per Clients' Requirements

Delivery timeIn 10-15 days after receipt of deposit or L/C,T/T
MOQ3 tons for each size

 

Brief Introduction

Galvanized steel pipe are also called Galvanized Steel tube and Gi pipe. It possess features of corrosion resistance,

anti-rust,acid resistance, which extend its service life largely. Galvanized steel pipe is widely used in many area:

water pipe, gas pipe, oil and other generally low pressure fluid pipeline, and is also used in petroleum industry

especially the marine oil field oil well pipe, oil pipe, chemical coking equipment oil heater, cooler,

coal run oil exchanger tubes, mine tunnel support rack pipe etc.

 

 

 

About us

 

1.With Alibaba Trade Assurance you can enjoy:

*100%product quality protection

*100% on-time shipment protection

*100% payment protection for your covered amout

2.We accept Transactions via

3.Wholesale low MOQ

4.Assessed supplier

5.Onsite checked

5.A&V checked

6.On-time shipment

 

Galvanized steel pipe sizes

 

Outer DiameterWall ThicknessLength
Inchmmmmmeter
1/2"21.3mm0.6mm-3.0mm0.3m-12m
3/4"26.9mm0.6mm-3.0mm0.3m-12m
1"33.4mm1.0mm-3.0mm0.3m-12m
1-1/4"42.3mm1.0mm-4.0mm0.3m-12m
1-1/2"48.3mm1.0mm-4.0mm0.3m-12m
2"60.3mm1.5mm-4.0mm0.3m-12m
2-1/2"76.1mm1.5mm-4.0mm0.3m-12m
3"88.9mm1.5mm-9.5mm0.3m-12m
4"114.3mm2.0mm-9.5mm0.3m-12m
5"141.3mm3.0mm-9.5mm0.3m-12m
6"168.3mm3.0mm-12.0mm1.0m-12m
8"219.1mm3.2mm-12.0mm1.0m-12m
10"273mm3.2mm-12.0mm1.0m-12m
12"323.8mm6.0mm-15.0mm1.0m-12m
14"355.6mm8.0mm-15.0mm1.0m-12m
16"406.4mm8.0mm-20.0mm1.0m-12m

 

Products Show

scaffolding steel pipes/tube made in china
 
 
scaffolding steel pipes/tube made in china
 
 
 
 
 scaffolding steel pipes/tube made in china

Mill and Warehouse

scaffolding steel pipes/tube made in china

Staff&Clients

scaffolding steel pipes/tube made in china

Certificates

scaffolding steel pipes/tube made in china

FAQ

Q1. Are you trading company or manufacturer ?
A: We are processing factory. our factory locates in Songjiang Steel City. if you would like to visit our factory,

just inform us in advance, we will pick you up at the airport. we warmly welcome all of our clients to visit us.

Q2: How long is your delivery time?
A: Generally, it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is

according to quantity.

Q3. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages

before you pay the balance.

Q4. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q5. What is your sample policy?
A: We can supply free samples if we have ready parts in stock, but the courier cost are charged.

Q6: what is your main products?
A: our main products is hot rolled carbon steel, including angle steel, H beam, I beam, channel steel,

rebar, square pipe, round pipe, steel plate/coil. we can also have them galvanized.

 

Contact:chelsea

Mob&whatsapp:+86 13651652591

Skype:Chelsea Shao

Tel:+86-21-66866895

Contact Supplier

Ms. manager cz salesman Chat Now
Telephone
86-021-66866895
Mobile
15298749588
Fax
86-021-66866895
Address
Room321 NO 222,Meidan Road,Meilan Lake ,Baoshan District Shanghai

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~