Hamburger Machine/Burger Machine/Patty Forming Machine
USD $4,000 - $100,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Instuction
APF Series hamburger patty former is suitable to make hamburger patty, chicken nugget, beef steak, fish cake, hash brown potato, etc. The shape and sizes can be various by changing different moulds.
Sample picture
Features
APF Series Hamburger Patty Former can automatically perform all procedures including material filling, forming and output. It features high production capacity and stable quality. The material feeding is by four-screw system, which can greatly reduce the cutting of the material, and has better features of high production capacity and stable quality.
The raw materials can widely be any meat, fish, shrimp, potato, pumpkin, carrot, green beans, vegetable, and tubers. APF Series Hamburger Patty Former can also be applied in fields of all kinds of minced / sliced products for premier meat texture taste. Easy and convenient raw material replacement and accurate weight control make it possible to control the production cost.
The machine is more safe and reliable by using good quality stainless steel nonmetal materials. This conforms to the standards of HACCP. Using original Germany SIEMENS PLC processor, allocating auto failure alarm system and touch screen in bilingual languages make it safe and convenient for operation.
Technical parameter
Model | APF-200 | APF-400 | APF-600 |
Power | 0.55kw | 12kw | 15kw |
Max. output | 50-100kg/hr | 500-600kg/hr | 1000-1200kg/hr |
Speed | 15-30times/min | 15-55times/min | 15-60times/min |
Patty thickness | 6-20mm | 6-30mm | 6-40mm |
Max. patty diameter | 100mm | 135mm | 150mm |
Patty weight error | ≤1% | ≤1% | ≤1% |
Tank Volume | 32L | 150L | 200L |
Raw material type | Versatile | Versatile | Versatile |
Filling pressure | Mechanical type | 3-15Mpa | 3-15Mpa |
Weight | 90kg | 1100kg | 1500kg |
Dimension (L x W x H) | 715 x 600 x 1400mm | 2828 x 830 x 2136mm | 3170 x 1180 x 2640mm |
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.