Soy Protein/Textured Soy Meat Making Machine
USD $10,000 - $30,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Introduction
DR-65 Texture soya protein machine is the latest botanic protein food processing line which is developed independently according to our national conditions against market requirements.
Certificate
CE CERTIFICATE provided, which strictly meet CE standards and EU countries’ import policy.
Machine picture
Sample picture
Features
1. Technology: Based on advanced Switzerland and American machinery.
2. Raw material: It used soy bean powder or peanut powder to break spherical protein molecule to form chain protein molecule, thus creating slice-like fiber structure, by powder-grinding, stirring, high-temperature, high pressured and high-cutting.
3. The product is nutritious without cholesterol or animal fat, but it looks like and tastes like meat with the quality of absorbing soil, water, and flavor.
4. Application: Widely applied in meat-product industry, fast-food industry and instant-cool food industry.
5. Also produce a wide variety of botanic meat.
6. Turnkey project provided, from raw materials to packing procedures.
7. Fully stainless steel 304.
8. CE certified.
9. Flow chart: flour mixing-screw conveying-extruding-air conveying-drying-flavoring-cooling.
Technical Parameters
Model | DR-65 | DR-70 | DR-85 | DR-90 |
Capacity | 120-150kg/hr | 150-300kg/hr | 500-800kg/hr | 800-1000kg/hr |
Power | 80kw | 90kw | 150kw | 200kw |
Dimension | 18 x 5 x 3m | 20 x 5 x 3m | 35 x 5 x 3m | 40 x 5 x 3m |
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.
Delivery
Our Factory
Exhibition
FAQ
If interested, please feel free to contact me now!!!