3d Pellet Snacks Production Line/making Plant/extruder Machine
USD $48,000 - $68,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
3d Pellet Snacks Production Line
1. Description:
3d Pellet Snacks Production Line is produced by single-screw extruder through extruding cooking; the pellet can be different shapes like shell, spiral, square tube, circle tube, and so on. After drying, the pellet needs frying to get expanded.
2. Raw materials: Adopts potato starch, corn starch, cassava starch, wheat flour, corn flour etc as raw materials.
3. Capacity: 100-150kg/hr
4.Certificates: CE & ISO9001 Certified.
5. Products: This line can be used to produce Shell, spiral, square tube, circle tube shapes.
6. Machines materials: All the machines are made by stainless steel.
7. Flow chart:
Mixing system---Extrusion system----Cutting system---Drying system---Frying system---Flavoring System --Packing system.
8. Voltage in China: Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers' Local voltage according to different countries.
9. Samples
10. Technical parameter
Model | Installed power | Real power | Output | Dimension |
DRD-100 | 90kw | 70kw | 100-120kg/h | 27000x2000x2000mm |
11. Key equipments
12. Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s factory size; if the customer
needed, we could make workshop design with electricity power, water supply, gas power, material
storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country
immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to
get the Visa. While the machines arrives your factory, our engineers are ready to start for the
commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal
production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain
and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the
date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD100 are on client’s
account.
13. Delivery