Complete Automatic Breakfast Cereals Production Line
USD $50,000 - $210,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Complete Automatic Breakfast Cereals Production Line
DR series double screw extruder:
Screw and barrels: barrel has 3 parts: inside barrel equipped with alloy hardness: HRC 55 Barrels are equip with 3 liquid inlets for necessary additives (optional)
Screw material: 38CrMnAl
Screw hardness: HV 900-1000 (HRC65-72)
Cutting system: Face cutter is equipped with 1-4 pcs cutting knives for face cutting of the product out of the extruder, the speed is adjustable.
Control system: all motors, valves and pump of the mixing, conditioner and extrusion system controlled by cabinet controller.
Certificate
CE CERTIFICATE, ISO9001 CERTIFICATE
Samples
Features
1. The raw materials can be maize, rice or wheat flour, etc.
2. The performance and quality of Breakfast Cereal Corn Flakes Production Line reaches the highest international level in its field.
3. Corn Flakes Production Line is not just a combination of machines, but an integrated process
starting with raw material feeding and ending at the packaging room.
4. Most popular shapes can be made, while various recipes are provided.
5. Turnkey project provided, from raw materials to packing procedures.
6. Fully stainless steel 304. CE and Iso9001 certified.
Technical Parameters
Model | DR-65 | DR-70 |
Output | 150kg/hr | 300kg/hr |
Installed Capacity | 130kw | 165kw |
Space needed | 35 x 5 x 3m | 42 x 5 x 3m |
Weight | 19000kg | 29000kg |
Workers Required | 4-6 Workers | 6-8 Workers |
Key Equipment Show
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After receiving firm order and down payment, we start to apply for the Visa to your country immediately; while the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. Our engineers can provide basic formula for the production, and help the customer to produce good quality food according customer’s detailed formula.
6. It normally costs 10-14 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
Delivery