Corn Flakes/Breakfast Cereals Snacks Machinery
USD $40,000 - $210,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Corn Flakes/Breakfast Cereals Snacks Machinery
Description:
Corn Flakes/Breakfast Cereals Snacks Machinery adopts corn, rice, wheat, oat, barley etc as ingredients to make puffed snack. Through friction of screw and barrel, the grains are cooked in the extruder. Forming is at the die face cutter. The product shape is determined by a combination of the die aperture, including ball, tube, stick, ring, fruit loop, star, wheel and flower etc.
Raw materials: adopts corn, rice, wheat, oat, barley etc as ingredients.
Products: Variety shapes are available for ball, tube, stick, ring, fruit loop, star, wheel and flower and heart shape by adjusting the mould in the extruder
Capacity: 150kg/h, 240kg/h, 500kg/h
Flow chart: Mixing system---Extrusion system---- -Drying system----Flavoring system---Packing system
Voltage in China: Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers' Local voltage according to different countries
Machines Materials: Corn Flakes/Breakfast Cereals Snacks Machinery All the machines are made by stainless steel
Technical Parameters
Model | Installed power | Real power | Output | Dimension |
DR-65 | 81.5kw | 53kw | 100-150kg/h | 21000x1200x2200mm |
DR-70 | 115kw | 76kw | 200-240kg/h | 23000x1500x2200mm |
DR-85 | 181kw | 117kw | 400-500kg/h | 28000x3500x4300mm |
Samples
Spare Parts
Delivery
Commissioning & After-sales Service
1.We make accurate factory layout design according to customer's factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker's restroom, etc.
2.After delivering machines to client's factory, we start to apply for the Visa to client's country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3.1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4.Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5.It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6.The engineer's round-trip flight tickets, accommodation and daily salary USD 60 are on client's account.