Nutritional Powder Processing Line/baby Food Production Line/making Machine
USD $30,000 - $80,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Nutritional Baby Powder Processing Line
Introduction
Nutritional Baby Powder Processing Line can produce all kinds of baby foods, such as nutrition powder, instant drink mixes, instant fruit dessert, etc.
Certificate
CE CERTIFICATE provided, which strictly meet CE standards and EU countries import policy.
ISO 9001 CERTIFICATE provided, which strictly meet ISO 9001 standards.
Samples
Features
1. Baby Nutrition Powder Machine able to handle a wide range of raw materials by simply varying the temperature, moisture and drying parameters.
2. Baby Nutrition Powder Machine raw materials can be a wide range of flours and starches, pure or blended, such as rice, soy, corn, oat, millet, wheat, sorghum, banana, cassava and potato.
3. Various recipes are supplied, which can add vitamin, mineral and other nutritional substances to meet different nutritional requirements.
4. Baby Nutrition Powder Machine compact equipment design.
5. Baby Nutrition Powder Machine lower maintenance costs.
6. Minimal shear action during the extrusion process provides end products with high viscosity in cold water.
7. Turnkey project provided, from raw materials to packing procedures.
8. Baby Nutrition Powder Machine fully stainless steel 304.
Technical Parameters
Output | Installed Capacity | Actual Capacity | Voltage / Frequency | Dimension | Workers Required |
120-150kg/hr | 66kw | 50kw | 380V / 50Hz | 15 x 5 x 4m | 2-4 workers |
Key Equipment Show
Customers Visit
Shipments
Commissiong Service
1.We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2.After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3.1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4.Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5.It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6.The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.