3/5/7 layer corrugated cardboard production line /corrugated cardboard making line
USD $200,000 - $6,000,000 /Set
Min.Order:1 Set
Dongguang Xinhua Packing Machinery Co., Ltd.
corrugated carton packing line/corrugated carton machine:
3-layer,5-layer,7-layer production line are all avalaible.
Width from 1400mm to 2500mm.
production speeds from 40-250 meters/min.
Customer's special needs catered by experienced corrugated company.
We can supply a complete corrugator or individual equipment to complete your own line.
Please take the following for your reference:
3-layer corrugated paperboard production line
NAME | Ecnomical model | Standard model | High-grade model | |
Electric mill roll stand (include the trolley for upload paper) | 2sets | 2sets | ||
Hydraulic mill roll stand (include the trolley for upload pape) | 3sets | |||
Preheater φ400mm, electromotion | 1set | 2sets | ||
Preheater φ600mm, electromotion | 2sets | |||
Single facer (rollerφ266mm) | 1set | |||
Single facer (rollerφ280mm) | 1set | |||
Single facer (rollerφ320mm) | 1set | |||
Transport bridge (electrical adjusting deflection, adsorption tension) | 1unit | 1 unit | ||
Heavy transport bridge (electrical adjusting deflection,adsorption tension) | 1unit | |||
Duplex preheaterφ400mm, electromotion | 1set | 1set | ||
Duplex preheaterφ400mm, electromotion | 1set | |||
Double glue machine-A type | 1set | 1set | ||
Double glue machine-B type | 1set | |||
Double facer (520mmX9 pcs heat plate, 4.5m ) | 1unit | |||
Double facer (520mmX11 pcs hot plate, 5m ) | 1unit | |||
Double facer (520mmX14 pcs hot plate, 6m ) | 1unit | |||
Thin blade (electric centering | 1set | |||
High speed of thine blade (electric lift-lower, electric centering | 1set | 1set | ||
Cutoff | 1set | |||
NC.cutoff | 1set | 1set | ||
Cardboard conveying machine | 1set | |||
Stacker | 1set | |||
Glue-making system | 1unit | 1unit | 1unit | |
Heat-guiding system(300,000 kilocalorie) | 1unit | |||
Heat-guiding system(400,000 kilocalorie) | 1unit | |||
Steam system | 1unit |
The product is checked by the standard of carton box, and has passed ISO 9001:2000 certification. Repaire for one year, assistant with the customer.
NOTE: the customer-owned part
1. Steam heating system 4000kg/Hr a steam boiler the pressure 1.4-1.6MPa
The steam pipeline and the back to the gas drainage pipe of vave on equipment
2. air compression pump, compressed air line, glue tube
3. the source of electricity wire access to operation counter and cable routing management
4. the source of water, water pipeline,bucket
5. water, electricity, gas ground plane to stall civil work
6. test base paper used, corn starch(potato), industrial caustic soda, borax etc. material