2015 heat exchang station pipeline use stainless steel 4 inch ball valve
USD $210 - $68,900 /Set
Min.Order:1 Set
Shenyang Taike Fluid Control Co., Ltd.
TKFM factory directly sale water media pneumatic fully welded ball valve
TKFM factory directly float ball reduce bore pneumatic fully welded ball valve
TKFM manual type gas pipeline used 2 inch underground reduced bore ball valve
2015 TKFM handle lever operation reduce bore wear-resistant full welded ball valve
PN25/PN40 | |||||||||||||
Full Bore Flange/Flange | |||||||||||||
DN | NPS | PN | L | D | D1 | D2 | H | B | C | H1 | Weight(kg) | Torque(N.M) | |
15 | 3/8 | 40 | 130 | 10 | 95 | 14 | 98 | 145 | - | 22 | 1.9 | 1-2 | |
20 | 3/4 | 40 | 150 | 15 | 105 | 14 | 103 | 145 | - | 23 | 2.7 | 3-4 | |
25 | 1 | 40 | 160 | 20 | 115 | 14 | 118 | 145 | - | 34 | 3.3 | 5-7 | |
32 | 1-1/4 | 40 | 180 | 25 | 140 | 18 | 120 | 145 | - | 34 | 5 | 8-11 | |
40 | 1-1/2 | 40 | 200 | 32 | 150 | 18 | 121 | 190 | - | 43 | 6 | 12-18 | |
50 | 2 | 40 | 230 | 40 | 165 | 18 | 127 | 190 | - | 44 | 7.9 | 25-32 | |
65 | 2-1/2 | 25 | 270 | 50 | 185 | 18 | 170 | 280 | - | 71 | 11.3 | 38-45 | |
80 | 3 | 25 | 280 | 65 | 200 | 18 | 185 | 280 | - | 77 | 14.9 | 55-65 | |
100 | 4 | 25 | 300 | 80 | 235 | 22 | 210 | 280 | - | 102 | 19.4 | 110-120 | |
125 | 5 | 25 | 325 | 100 | 270 | 26 | 253 | 400 | - | 102 | 28.5 | 200-250 | |
150 | 6 | 25 | 350 | 125 | 300 | 26 | 273 | 600 | - | 107 | 37.1 | 300-340 | |
200 | 8 | 25 | 400 | 150 | 360 | 26 | 300 | 900 | - | 123 | 63 | 450-480 | |
250 | 10 | 25 | 530 | 200 | 425 | 30 | 345 | 1200 | - | 122 | 108.6 | 750-800 | |
300 | 12 | 25 | 630 | 250 | 485 | 30 | 572 | 280 | 193 | 155 | 272 | 900-950 | |
350 | 14 | 25 | 690 | 300 | 555 | 33 | 697 | 325 | 150 | 187 | 462 | 1200-1300 | |
400 | 16 | 25 | 762 | 350 | 620 | 36 | 764 | 466 | 175 | 221 | 662 | 1900-2000 |
(1) Shell Hydrostatic Test
ANSI B 16.34 Section 7.1 | |||||||
Valve Size NPS | Test pressure | Test Time. Sce | |||||
Below DN50 | 1:5 times the 100°F | 15 Sce | |||||
DN65~DN200 | Rating of ANSI Class | 60 Sce | |||||
Up DN250 | Max. Operating Pressure | 180 Sce | |||||
Test pressure should be above 1.5 times than the valve's Max work pressure (100F) |
(2) Seal Hydrostatic Test
The pressure should be more 1.1 times than working pressure by seal hydrastatic test
ANSI B 16.34 Section 7.2 | |||||||
Valve Size NPS | Test pressure | Test Time. Sce | |||||
below DN50 | 1:1 times the 100°F | 15 Sce | |||||
DN65~DN200 | Rating of ANSI Class | 30 Sce | |||||
above DN250 | Max. Operating Pressure | 60 Sce | |||||
Test pressure should be more 1.5 times than the valve's Max work pressure (100F) | 180Sce |
(3) Seal Air Test
Seal air leakage test is based on 80PSIG(6kgf/cm2) inert-gas or the air reach the test pressure, then close the valve. after that check the valve whether it is leakage or not.
Material:
No. | Part name | Material | |||
1 | Body | Carbon steel St37.8 | |||
2 | Neck | PTFE+SPCB | |||
3 | Ball | 304 stainless steel | |||
4 | Stem | 2Cr13 | |||
5 | Seat | 25%C+PTFE | |||
6 | Metal washer | 60Si2Mn | |||
7 | Spring | 60Si2Mn | |||
8 | "O" Ring | FPM | |||
9 | End piece | Carbon steel St37.8 | |||
10 | Handle | Carbon steel +HCr | |||
11 | "O" Ring | FPM | |||
12 | Gland | 304 stainless steel |
worm gear full port fully welded ball valve