SR201 Two-way electrical brass valve for HVAC system
USD $20 - $50 /Piece
Min.Order:10 Pieces
Shenyang Taike Fluid Control Co., Ltd.
SR201 AC24V,110V,220v removable head normal closed motorized brass valve
SR2012 electric Balancing Valve DN15 20 25 Brass Balance Valve Thread 2 Way 3 way Motorized valve
2016TKFM hot sale SR5016 Two-way/Three-way 3-wire On/off Motorized Valve for HVA
2016TKFM hot sale SR202 normal closed Two-way Electric Valve for HVAC 1/2" 3/4" 1'' PN16
SR201 Two-way electrical brass valve for HVAC system
Product description:
SR201 electric two-way valve is used in controlling the cold or hot water pipe on or off in air conditioning system, for the purpose of controlling room temperature. valve is driven by hysteresis synchronous motor, returned by spring. When the valve does not work, it’s in normally closed state, when it works, A opening signal is provided by thermostat, to make the electric valve connect AC power and become opening state, cold water or hot water flows into the fan coil, to provide cool air or hot air for room; once the room temperature reaches the setting point of thermostat, the thermostat will shut down the power of electric valve and the spring will return to make the valve closed, thus cutting off the flow of water into the fan coil. As the valve closed or open, room temperature is always maintained at the thermostat setting temperature range.
SR201 series has two forms : two-way normally closed valve and three-way split valve, the sizes of valve threads are DN15, DN20, DN25 three type.
SR201 electric valve’s actuator and valve itself are installed by slip-on connection, So, the actuator can be installed after the valve is installed.
Features:
Forged brass body
Stainless steel seat, aluminum casing
Fully enclosed hysteresis synchronous motor, stainless steel spring
Body Connection thread: British standard flat thread (female thread) BSPP
North America used pipe thread (female thread) NPT
Motor power, low noise, light weight, easy to use, at the rated voltage frequency of the motor speed is not affected,
Remains constant, if the motor overload or stall, the motor coil will not burn
actuator and valve itself are installed by slip-on connection, which can be quickly and easily disassembled without any tools, so it’s easy to install and use
Technical Parameters:
Valve size: DN15, DN20, DN25
Connection: threaded connection
Valve structure: two-way, three-way
Media: hot / cold water
Pressure: PN20
Close differential pressure: 0.18 ~ 0.22Mpa
Power supply voltage: AC220V ± 10%, 50 / 60HZ
consumable power: <6.5W
Run mode: On or Off
Valve action time: Opening time: ≤18S Closing Time: ≤7S
Model and size
model | Size (mm) | ||
A | B | C | |
DN15 two-way valve | 70 | 23 | 86 |
DN15 three-way valve | 70 | 33 | 86 |
DN20 two-way valve | 79 | 23 | 90 |
DN20 three-way valve | 79 | 34 | 90 |
DN25 two-way valve | 88 | 23 | 95 |
DN25 three-way valve | 88 | 42 | 95 |
Specification
Model | Flow Coefficient(KV) | Thread
| Differential pressure | Medium | Medium Temp | Ambient Temp | PN | power |
DN15 two-way valve | 2.2(2.5) | 1/2’’ | 0.22 | Water/ Hot water | 0-94℃ | 0-40℃ | 2.0 | AC 24V AC 110V AC 220V 50/60Hz |
DN15 three-way valve | 2.6(3.0) | 1/2’’ | 0.22 | |||||
DN20 two-way valve | 3.0(3.5) | 3/4’’ | 0.20 | |||||
DN20 three-way valve | 3.4(4.0) | 3/4’’ | 0.20 | |||||
DN25 two-way valve | 6.9(8.0) | 1’’ | 0.18 | |||||
DN25 three-way valve | 6.5(7.5) | 1’’ | 0.18 |
CERTIFICATION: ISO, TS, API, GOST, CE....etc
We pay much attention in Test process:
(1) Shell Hydrostatic Test
ANSI B 16.34 Section 7.1 | |||||||
Valve Size NPS | Test pressure | Test Time. Sce | |||||
Below DN50 | 1:5 times the 100°F | 15 Sce | |||||
DN65~DN200 | Rating of ANSI Class | 60 Sce | |||||
Up DN250 | Max. Operating Pressure | 180 Sce | |||||
Test pressure should be above 1.5 times than the valve's Max work pressure (100F) |
(2) Seal Hydrostatic Test
The pressure should be more 1.1 times than working pressure by seal hydrastatic test
ANSI B 16.34 Section 7.2 | |||||||
Valve Size NPS | Test pressure | Test Time. Sce | |||||
below DN50 | 1:1 times the 100°F | 15 Sce | |||||
DN65~DN200 | Rating of ANSI Class | 30 Sce | |||||
above DN250 | Max. Operating Pressure | 60 Sce | |||||
Test pressure should be more 1.5 times than the valve's Max work pressure (100F) | 180Sce |
(3) Seal Air Test
Seal air leakage test is based on 80PSIG(6kgf/cm2) inert-gas or the air reach the test pressure, then close the valve. after that check the valve whether it is leakage or not.
1.100% factory price, because we are direct producer of ball valve, butterfly valves, check/non-return valves, gate valves and so on.
2.Market, technical support and after-sale service within 24 hours.
3. You can order your own configuration.
A: Manual B: pneumatic C: electric D: bare shaft E: disc with pin F: disc without pin G: double half shaft H: one piece body I: two pieces body J: logo
Fully welded ball valve - Company advantages:
1. We are factory: We have strict quality control system and amounts of testing equipments for different kind of valve, such as size, pressure, working environment etc. also can provide the competitive price.
2. Certification: API, CE, ISO,GOST, TS ..etc
3. Low MOQ: Our factory owns the casting company by itself. We are always ready for providing the sample and producing some small orders, in order to meet the business well.
4. OEM Accepted: We can make the products with the client's demand standard or the customer requirement.
5. Complete Service: We are always ready to hear from you, reply within 12 hours.
6. Quick Delivery: We always keep the large stock for some hot products.
1.What's payment terms? 30% payment in advance, 70% balanced before delivery. (if total value is USD$ 500, we suggest 100% payment in advanve.)
2.What's MOQ? One set. (if small size, we can check if free sample or not, freight need to be paid by customer.)
3.How control the quality of ball valve?
Select high quality raw material; Strict required during machining; Seat material comply with food grade; Tested twice to insure zero leakage; First copper plating disc, then nickle plating disc to increase the adhesiveness
4.Delivery time?
10-15 days after received the advance payment. (if stock, about 10 days)