TKFM low pressure 6 inch electric butterfly valve medium water
USD $5 - $100 /Set
Min.Order:10 Sets
Shenyang Taike Fluid Control Co., Ltd.
China high quality low pressure electric actuator with rubber sealing butterfly valve Quality Choice
China standard low pressure 6 inch electric motorized butterfly valve
2016 CF8M disc LT type worm gear water butterfly valve PN 16
TKFM CF8M wafer supply electric actuator Lug type butterfly valve with good price
TKFM water supplying flanged PTFE seal butterfly valve DN50 - 450
2015 TKFM low pressure flange connection 4 inch high performance ptfe butterfly valve
Terms of payment: 30% in advance as deposit, the balance paid before delivery.
Delivery time: 30 days after receiving the prepayment.
Terms of trading: FOB, CFR, CIF
Guarantee: 12 months
Fully welded ball valve - Company advantages:
1. We are factory: We have strict quality control system and amounts of testing equipments for different kind of valve, such as size, pressure, working environment etc. also can provide the competitive price.
2. Certification: API, CE, ISO,GOST, TS ..etc
3. Low MOQ: Our factory owns the casting company by itself. We are always ready for providing the sample and producing some small orders, in order to meet the business well.
4. OEM Accepted: We can make the products with the client's demand standard or the customer requirement.
5. Complete Service: We are always ready to hear from you, reply within 12 hours.
6. Quick Delivery: We always keep the large stock for some hot products.
1.What's payment terms? 30% payment in advance, 70% balanced before delivery. (if total value is USD$ 500, we suggest 100% payment in advanve.)
2.What's MOQ? One set. (if small size, we can check if free sample or not, freight need to be paid by customer.)
3.How control the quality of ball valve?
Select high quality raw material; Strict required during machining; Seat material comply with food grade; Tested twice to insure zero leakage; First copper plating disc, then nickle plating disc to increase the adhesiveness
4.Delivery time?
10-30 days after received the advance payment. (if stock, about 10 days)