2000m, 650HP, Truck Mounted Drilling Rig ZJ20
Negotiable /Set
Min.Order:1 Set
Lijin Hongsheng Industry Co., Ltd.
Item | Model | ZJ30/1700CZ |
1 | Drilling depth:m (ft) (4-1/2”DP) | 3000(9840) |
2 | Well servicing depth:m(ft)(3-1/2”DP) | 6500(21325) |
3 | Max.hook load:KN(lb) | 1700(381260) |
4 | Rope line diameter:mm(in)/number | 29(1-1/8”)/8 |
5 | Max.hook lifting speed:m/s(ft/s) | 1.36(4.46) |
6 | Moving dimensions:m(ft) | 21.25×3.3×4.47(69.7×10.8×14.67) |
7 | Weight:kg(lb) | 76000(167548) |
8 | Power system | CAT3406C/C15 |
9 | Engine power:KW(hp)(2100r/min) | 343×2 (460×2)/402(540)×2 |
10 | Model of hydraulic transmission | ALLISON-S5600×2 |
11 | Emergency power | —— |
12 | Chassis driven | 14×8 |
13 | Min.turning radius:m(ft) | 42(137.8) |
14 | Min.ground clenrance:mm/in | 340/13.39 |
15 | Drowworks | Double drum(single drum) |
16 | Drowworks power:hp | 750 |
17 | Diameter of main drum: mm(in) | 480×914.5(18.9×36) |
18 | Mian brake | Belt type(disc type can be chosen) |
19 | Auxilary brake | WCB324 disc brake |
20 | Drawworks lifting shifts | 5 forward 1 reverse |
21 | Derrick model(double sections extension mast) | JJ180/36-W /JJ180/38-W |
22 | Derrick height: m(ft) | 36(118.11)/38(124.6) |
23 | Racking platfrom height: m(ft) | 20.4(66.9) |
24 | Wind speed:km/h(kn) | 110(60) |
25 | control/lighting/electric circuit | 24V/220V/380V(china) |
26 | Rated pressure of hydraulic/air:MPa(psi) | 14/0.833-0.93(2002/119.12-133) |
27 | Rig floor | DZ180/6-Z foldable substructure |
28 | Rotary table | ZP205 |
29 | Treveling block/hook | YG170 |
30 | Swivel | SL225 |