7X7 Ungal Steel Wire Rope
USD $1,420 - $2,238 /Meter
Min.Order:2000 Meters
Jiangyin Gaosheng Metal Manufacture Co., Ltd.
NO. | ITEM | DETAIL |
1 | Structure | 7X7 |
2 | Steel Grade | High Carbon Steel |
3 | Standard | AISI ASTM BS DIN GB JIS API ISO |
4 | Core | IWRC, IWS, FC, PPC |
5 | Wire Gauge | 1-20mm |
6 | Surface | galvanized |
7 | Tensile strength | 1570,1670,1770,1870,1960MPa |
8 | Application | machine-made industry,shipping industry, fishing, architecture, elevator, household products etc. |
9 | Material | From "Bao Steel" and "Sha Steel" |
10 | Place of Origin | Jiangsu, China(Mainland) |
11 | Type | Normal, S, W, WS, FI, SWS |
12 | LENTH/REEL | Length per reel in meter or feet and According to customer's needs. |
Payment & Shipping Terms
NO. | ITEM | DETAIL |
1 | Trade Term | FOB |
2 | MOQ | 2000meter |
3 | Port | SHANGHAI |
4 | Package | On strong wooden wheel, plastic reels ,wrapped with PP cloth, with label on the reel side and then pack by wooden pallets or wooden crates before shipping. or According to customer's needs. |
5 | Delivery Time | 15-30 days after received deposit |
6 | Payment Terms | T/T 30% down payment in advance, T/T balance 70% before delivery date.or L/C |
7 | Supply Ability | 200Ton/Month |
8 | HS Code: | 7312.100000 |
Technical Specifications
The direction of twist wire rope
After-sales service:
Exchange and return policy: Contact us within 24 hours if the goods is defected.
Freight: Buyers in charge of sending goods back and supplier responsible for resending fees
Production Flow and packing
FAQ:
1.Q:Are you a factory or trading company?
A:We are a factory.
2.Q:Where is your factory located? How can I visit there?
A:Our factory is located in Jiangyin City,Jiangsu Province, China ,about 3hours bus ride from Shanghai .All our clients, from home or abroad, are warmly welcome to visit us!
3.Q:What is the material of your products?
A: The material is steel wire. We can also choose material as customers’ requirement.
4.Q:How can I get some samples?
A: We are honored to offer you samples.
5.Q:How does your factory do regarding quality control?
A:"Quality is priority. We always attach great importance to quality controlling from the very beginning to the very end.