Turbo Head Cock Valve/Low Torque Valve/Plug Valve API 6A
USD $1 - $2,000 /Piece
Min.Order:1 Piece
Yancheng Ruide Petrochemical Machinery Co., Ltd.
API 16A Double Ram BOP/Annular Blowout Preventer/Single Ram BOP for wellhead control
API manual and hydraulic choke manifold for oilfield equipment
API 16C hydraulic/manual high pressure kill manifold Choke Manifold
API 16C High Quality Choke and Kill Manifold for Oil Well Control
Choke and Kill Manifold/API 16C High Pressure Manifold/Choke Manifold
Oil quarry in cementing and fracturing operation of the high voltage connections when an indispensable important components, but also to a similar high-pressure liquid control. The product structure is compact, easy maintenance, small torque, opened quickly, operation effort, is cementing and fracturing of the best in the valve.
Working principle and structure characteristics:
Mainly by the valve body, hand wheel, plunger, and other component parts.
Import and export have adopted 1502 from the previous form of connectivity (also customized according to customer needs), the valve body and between the cylinder liner tile with tile and through lining embedded into seals Cylindrical Seal.
Contrast between the tile and plunger seal cylindrical metal complexes, characterized with high precision, sealed reliable.
Note: 10000 psi high-pressure, can also more relaxed on or off valve.
Operation and use:
Fat should be sealed before use shell to fill the gap between the plunger
Use of a water pressure should be sealed before trial and pressure strength test, before they can be used.
Before the use of state should check the switch is consistent with the labeling, hand round of rotating 90 degrees to be achieved on or off.
Maintenance and maintenance:
Regular and timely maintenance can extend valve life.
Work should be finished in time cleaning and oiling, greasing;
Periodic inspection seal, found that the timely replacement of damaged;
When the plunger seal with the lining kilowatts not, should be timely demolition inspection, if found sealing surface defects, which can carry out grinding repair.
Helium gas detection
Tensile Yield stength test
Our Warehouse is about 2000 square meters.
80H CNC and GLU16X20 Gantry CNC
Packing Details : Plywood case as per international standard
Delivery Details : 20 - 60 days after order (According to total quantity of products)
Ruide has got API 6A 6D 16A 16C certifications and the right to use the API monograme from 2007 for already 9 years, and also has ISO 9001 14001 OHSAS 18001 certifications and could provide DNV GL ABS certification as requirement.
A: We are one of the professional manufacturer for many years for petroleum machinery .
A: Generally it is 5-10 days if the goods are in stock. or it is 15-45 days if the goods are not in stock, it is according to quantity.
.