200l automatic micro brewery / beer brewery equipment from china for small business
USD $3,000 - $40,000 /Set
Min.Order:1 Set
Jinan Haolu Machinery Equipment Co., Ltd.
very low investment beer brewery equipment
beer production line
beer equipment brewery from fermenting equipment supplier
bar/ hotel/home beer brewing equipment
micro beer brewing equipment
1.Capacity:200L/D
2.Usage:for brewery pub hotel or restaurant
3.Control:PLC
4:Materials:Red copper,s304
This beer fermenting machine Very suitable for bar ,hotel,resorts or home to make the beer
1.Company Introduction:
We Jinan Haolu Machinery Co., Ltd was established in 2009,located in the beautiful Spring City-Jinan.It is the most influential and professioanl beer equipments company in China which integrates with R&D, Productiuon and Sales.We are professional in making the beer machinery,fermentation machinery,saccharication and so on.We have the technological engineers that have the rich experiences,best after-sales services and professional producing craft.
2.The main configuration of the complete brewery production line:
Milling system Saccharification system Fermentation system
Refrigeration system CIP Washing and sterilization systemControl system
3.Technological specification:
Outside surface | Stainless steel or red copper,THK:1.5mm-3mm |
Inner surface | S.S.304,THK:2mm-4mm |
Top shape | Seal head or conical head |
Heating method | electricity/Steam |
Insulation layer | Protected by polyurethane,THK:70-100mm |
Polishing | ≤0.4µm |
Manhole | Side upward or your requirements |
Plate heat exchanger | 4m² |
Agitator | Raking system conneted into a top reducer |
The output of Beer making machinery pls as a reference:
daily output | 100L | 200L | 300L | 500L | 600L | 800L | 1000L | 2000L | 3000L | 5000L |
unit type | HL100 | HL200 | HL300 | HL500 | HL600 | HL800 | HL1000 | HL2000 | HL3000 | HL5000 |
floor space | 15m² | 20m² | 25m² | 45m² | 55 m² | 70m² | 80m² | 120m² | 150m² | 250m² |
power | 8KW | 12KW | 20KW | 35KW | 35/15KW | 35/15KW | 35/15KW | 65/15KW | 65/15KW | 65/15KW |
Beer production period | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days |
4.Technical parameters & relevant services
1. Output: 200 L/Batch
2. Square for work shop: 25 m2 and 2.5 m high
3. Installed Capacity: 20 Kw
4. Voltage / Frequency (3 phase): 380V / 50Hz or we can design it according to your actual requires.
5. Workers Required: 1-3 Workers
6. Warranty: At least 5 year from the date of completion of the commissioning.
7. Installation/Operation/ Service/ Maintenance Manual: Provided In English
PRE-SHIPMENT INSPECTION INCLUDES
a). Supplier should examine whole line at supplier’s factory before shipment;
b). Supplier has to guarantee each equipment’s quality;
c). All raw materials will be provided if the customer need for charging suitable fees.
EACH CLIENT CAN ENJOY THE FOLLOWING 7 SERVICES
a). Free consultation service before, during, and after sales;
b). Free project planning and design services;
c). Free debugging of equipment until everything is functional;
d). Free management of equipments' long distance shipping;
e). Free training of equipment maintenance and operating personally;
f). Free new production techniques and formulas;
g). Provide 1 year complete warrantee and life-time maintance service;
INSTALLATION SUPERVISION AND COMMISSIONING-Including salaries based on 40 hours per week as well as accident-and health insurance for:
1 Engineer for the duration of two or three weeks in total.
And he will install and debug the equipment. Give the workers guiding and technical training.
Period of installation:
The total length of the installation time depends on customer cooperation degree and site condition. A possible delay of the installation period will be additionally invoiced.
Success Project :
Contact Information: