1000L equipo de fabrica cerveza casero
USD $5,000 - $80,000 /Set
Min.Order:1 Set
Jinan Haolu Machinery Equipment Co., Ltd.
beer making equipment ,100L beer brewery, beer factory equipment, beer brewing system.turnkey project
micro homebrew/micro beer equipment for pub and restaurant /2000l microbrewery equipment brewing system for beer style lager and ale
beer machine in hotel/bar
beer making machine
beer making machine for brewery product
german beer making machine
automatic beer making machine
resorts beer brewery making machine
1.Capacity:1000L/D
2.Usage:for brewery pub hotel or restaurant
3.Control:PLC
4:Materials:Red copper,s304
1.daily output:2000L 2.material: SS304 3.polyurethane insulation 4.PLC automatic control 5.ISO&CE
This beer fermenting machine Very suitable for bar ,hotel,resorts or home to make the beer
Microbrewery beer equipment is a good choice for ginshop, barbecue, restaurant, pubs, who brew beer for the customers at scene. The luxury shape, small space demanded, no only has the ornamental value, but also can show the whole process of the brewering to the customers, let them learn the deep cultural connotation of beer. The characteristics of this equipment are: fabrication at scene, maintain the freshness and nutrition maximum. Rich in 17 kinds of amino acids, 8 essential amino acids to human but can not synthesized by ourselves, and more than 11 kinds of vitamins, especially B vitamins that rare in other foods; Besides, this equipment can also brew red beer, yellow beer, fruit beer, black beer, to meet different tastes and levels of customers.
Advantages:
2.Finishing:Mirror polishing (inner 3mm and outer 1.5mm)3.Material:stainless steel 304 with low price or red copper with nice- looking
4.Quality: ISO9001:2000 and CE certificate
1.Company Introduction:
We Jinan Haolu Machinery Co., Ltd was established in 2009,located in the beautiful Spring City-Jinan.It is the most influential and professioanl beer equipments company in China which integrates
with R&D, Productiuon and Sales.We are professional in making the beer machinery,fermentation
machinery,saccharication and so on.We have the technological engineers that have the rich experiences,best after-sales services and professional producing craft.
2.The main configuration of the complete brewery production line:
Milling system Saccharification system Fermentation system
Refrigeration system CIP Washing and sterilization systemControl system
3.Technological specification:
Outside surface | Stainless steel or red copper,THK:1.5mm-3mm |
Inner surface | S.S.304,THK:2mm-4mm |
Top shape | Seal head or conical head |
Heating method | electricity/Steam |
Insulation layer | Protected by polyurethane,THK:70-100mm |
Polishing | ≤0.4µm |
Manhole | Side upward or your requirements |
Plate heat exchanger | 4m² |
Agitator | Raking system conneted into a top reducer |
The output of Beer making machinery pls as a reference:
daily output | 100L | 200L | 300L | 500L | 600L | 800L | 1000L | 2000L | 3000L | 5000L |
unit type | HL100 | HL200 | HL300 | HL500 | HL600 | HL800 | HL1000 | HL2000 | HL3000 | HL5000 |
floor space | 15m² | 20m² | 25m² | 45m² | 55 m² | 70m² | 80m² | 120m² | 150m² | 250m² |
power | 8KW | 12KW | 20KW | 35KW | 35/15KW | 35/15KW | 35/15KW | 65/15KW | 65/15KW | 65/15KW |
Beer production period | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days | 10-12 days |
4.Technical parameters & relevant services
1. Output: 1000 L/Batch
2. Square for work shop: 25 m2 and 2.5 m high
3. Installed Capacity: 20 Kw
4. Voltage / Frequency (3 phase): 380V / 50Hz or we can design it according to your actual requires.
5. Workers Required: 1-3 Workers
6. Warranty: At least 5 year from the date of completion of the commissioning.
7. Installation/Operation/ Service/ Maintenance Manual: Provided In English
PRE-SHIPMENT INSPECTION INCLUDES
a). Supplier should examine whole line at supplier’s factory before shipment;
b). Supplier has to guarantee each equipment’s quality;
c). All raw materials will be provided if the customer need for charging suitable fees.
EACH CLIENT CAN ENJOY THE FOLLOWING 7 SERVICES
a). Free consultation service before, during, and after sales;
b). Free project planning and design services;
c). Free debugging of equipment until everything is functional;
d). Free management of equipments' long distance shipping;
e). Free training of equipment maintenance and operating personally;
f). Free new production techniques and formulas;
g). Provide 1 year complete warrantee and life-time maintance service;
INSTALLATION SUPERVISION AND COMMISSIONING-Including salaries based on 40 hours per week as well as accident-and health insurance for:
1 Engineer for the duration of two or three weeks in total.
And he will install and debug the equipment. Give the workers guiding and technical training.
Period of installation:
The total length of the installation time depends on customer cooperation degree and site condition. A possible delay of the installation period will be additionally invoiced.