Wholesale promotional products china pin wedge aluminum formwork
USD $150 - $170 /Square Meter
Min.Order:500 Square Meters
Ningbo Luowen Import And Export Co., Ltd.
New products on china market recycle aluminum formwork alibaba in dubai
China factory wholesale stripping head for aluminum formwork best selling products in japan
China online selling building construction aluminum formwork innovative products for import
China factory wholesale construction building aluminum formwork
China market wholesale building aluminum formwork best selling products in america 2016
Direct buy china construction aluminum formwork best selling products in japan
1 Purpose
Clear aluminum formwork system standard, and manage company product in technique. We shall improve our quality and let our customer satisfy to our product in increasing concrete quality, visual quality and no rendering process to reduce common fault.
2 Scope
The technique specification is suitable for its designing , producing, construction and technique management of aluminum formwork system.
3 Illustration
The customer will constructe at a long time with aluminum formwork system. Engineering Management Department analyse this project in consideration of the verticality of wall , smooth , the levelness of the slab, the size of section, visual quality and the challenge of new technology. Meanwhile, we control product from choosing material, designing and processing, erecting and examing formwork system. Please builders are according to specification to constructe. If any question, please contact to us.
4 Material selection
4.1 Aluminum Formwork System
4.1.1 Aluminum formwork system use 6061-T6 grade aluminum alloy.
4.1.2 Special mould, the changing part of standard floor can use aluminum material 3003.
4.1.3 The surface of the aluminum alloy uses anodic oxidation treatment.
Standard Panel Specificaiton Table
Name | width (mm) | Length (mm) | Brace (mm) | Facesheet (mm) | Frame (mm) |
Panel ( W ) | Most of them are 400,450,but some of them are 100,150,200,300. | The height of the floor excluding inside corner and outside corner | The thickness of brace is 6mm | 3.5~4.0 | 60 |
Inside Corner ( IC ) | 150 x 150,100 x 150, 100 x 100 | The height of the floor excluding inside corner and outside corner |
| 3.5~4.0 | 60 |
Outside Corner ( EC ) | 60 x 60 | The height of the floor excluding inside corner and outside corner |
| 6.0 |
|
Slab ( D ) | Most of them are 400,450,but some of them are 100,150,200,300 | 750,900,1050,1200 | The thickness of brace is 6mm | 3.5~4.0 | 60 |
Corner ( SC ) | 150 x 150,100 x 150, 125 x150 | 450,750,900,1200,1800,2400 |
| 3.5~4.0 |
|
Beam (EB MB) | 150 | 750,900,1050 | 50 | 3.0~4.0 | 60 |
1.1.1 Formwork designing is on the basis of the style of project, loading, equipment and material.
1.1.2 The design of aluminum panels and shoring must as follows:
(1). This system should suffer load, stiffness and stability, and should be able to have a stable load under new pouring concrete gravity, lateral pressure, wind load and load generated by the construction process.
(2). The structure should simple to convenient to erect and move away. In addition, it facilitates colligation installs steel, pour and cure concrete.
4.5 Steel Shoring and Waler
4.5.1.1.1 We use Q235 steel to shoring ,waler, pin and wedge.
4.5.1.1.2 The size of wealer is 40*60*3mm.
4.5.1.1.3 Steel shoring ,waler ,pin and wedge are managed with Zinc.
4.5.1.1 PVC Duct
Ducts are PVC , needing to use with pull rod. The diameter of duct is 32*3.2
4.5.2Processing
1)Designing and processing
Stage | Name | Time | Company | Content | Time(day) |
first | Deepen design | CAD structure drawing and architectural drawing after ordering | Customer | (1)Customer supply all parts of CAD structure drawing and building drawing. (2)make sure formwork system drawing.
| 15 |
Formwork company | Finish deepen designing including wall, slab, beam, stair and shoring, window and balcony and so on
| ||||
second | processing | Customer assures formwork drawing | Formwork company | Purchase materials, process panels and shoring system.
| 30 |
third | erecting | Customer examination | Formwork company | Erect system, exam and prefect | 10 |
Customer | (1)arrange workers to erect formwork system and study them
(2)examination | ||||
Customer | Examination | ||||
fourth | Delivery | Customer | Customer, Formwork company | Formwork number, pack and delivery | 5 |
4.5.3Designing Aluminum formwork System
The customer supply all CAD structure drawing and building drawing to us. Our engineer will finish to design formwork system according to them. Then we send formwork drawing to customer to make sure.
4.5.4Aluminum Formwork System Processing
4.5.4.1Cutting
4.5.4.1.1The examination of material
The material of aluminum alloy must supply certificate of quality, examination reports, and check the quality before cutting to make sure all parts of material in the range of good quality and smooth.
4.5.4.1.2The cutting of material
We will itemize material for different machine and then process according to the size of material. When we finish to cut them , we will number them to convenient to search.
4.5.4.2Welding
4.5.4.2.1Assembling welding
Our workers will weld semi-finished products according to the drawings our engineer hand down. The four corners need to spot welding. The sidrai needs to weld every 300mm. When all parts are finished, we will exam and adjustment.
4.5.4.2.2Molding welding
When you make sure assembling parts are right, we will continue to molding welding.
(1)Every component must full weld.
(2)Not standard component must weld every 300mm and weld about 50mm.
(3)The height of welding line will not less than 6mm.
(4)Don’t allow to weld less and tack weld.
Certificate
“Better Formwork Better Construction!”, founded in 1998 in Ningbo City of China, Ningbo Luowen Group Co., Ltd. is a profession group company in designing,researching and developing, manufacturing,selling and installing construction formwork. Of 2012, the annual sales value of Luowen Group had achieved US Dollars 25 million, and more than 70 percent was exported.
The founder of Luowen group is Mario, who was the construction engineer of Zhejiang Donghai Construction Group Co., Ltd. before. Mario had worked as a worker in Donghai Construction Group from 1980 to 1998, no matter day and night or being exposed to wind and rain, Mario took all mind and body to work and study hardly, so when Mario was in Donghai Construction Group, he had been the most excellent construction engineer even as a normal worker at first.
At the 1998, Mario gave up the comfortable job in Donghai Construction Group and founded the Ningbo Luowen Formwork Co., Ltd. at the first, Luowen Formwork Company had only 3000 square meters factory and 25 workers, Mario was not only the founder, but also the designer,technicist,production supervisor and sales manager, and this was just the rudiment of Luowen Group.
At the 2005, Ningbo Luowen Formwork Co., Ltd. had built its new factory which is of 42 000 square meters area, there are more than 400 employees including professional research and development team,production team,market team and installing team.
Also at the 2005, Ningbo Luowen Formwork Co., Ltd. decided to develop the international market of formwork, and establish the international department immediately, the first sales team included 3 sales then.
From 2005 to 2011, Ningbo Luowen Formwork Co., Ltd. had purchased most stocks of 5 formwork factory in China, and established Ningbo Luowen Group Co., Ltd. the head office is in the South Business District where is the biggest and most modern district in Ningbo city.
Ningbo Luowen Group Co., Ltd. insists the concept of “Market is the most exacting guiding, Customer is the most excellent teacher, quality is the most solid base, Credit is the most effective ensures!” We hope and try best to establish friendly and longtime cooperation with more and more customers all over the word.