Dried Pine Plywood I Beam for Pouring Formwork
USD $8 - $12 /Meter
Min.Order:2000 Meters
Ningbo Luowen Import And Export Co., Ltd.
Product introduction
With low weight, high rigidity and water proof, timber beam H20 is one of the most important components in the formwork system all over the world. It can be repeated used for many times, which save much cost.
Product features
1) Timber beam can be widely used in slab formwork system, vertical formwork (wall, column, hydraulic climbing etc.), adjustable arced formwork etc.
2) Timber beam system is easy to operation and can be assembled in different size and shape of formwork within certain range. The max. pouring height can be over 10 meters. As the lower weight of the materials, the formwork is much lighter than steel formwork.
3)With high standard components, the formwork can be repeated used for many times.
4)The wing board is using dried pine with a percentage of moisture below 13%. The wing board is composed of many pcs of short pine by using special adhesive to avoid the internal shear force. The web board is using plywood.
5)The surface of the timber beam is water proof, acid proof and alkali proof.
6)Fexible applications make the easy way to operate on building site
7)Surface: yellow waterproof painting or as per request
8)Advantage:Strong and stable than solid wood,low cost , cycle use,low formaldehyde emission and environment protecting etc.
9)High stiffness, light weight, strong load-carrying capability
Certificate
“Better Formwork Better Construction!”, founded in 1998 in Ningbo City of China, Ningbo Luowen Group Co., Ltd. is a profession group company in designing,researching and developing, manufacturing,selling and installing construction formwork. Of 2012, the annual sales value of Luowen Group had achieved US Dollars 25 million, and more than 70 percent was exported.
The founder of Luowen group is Mario, who was the construction engineer of Zhejiang Donghai Construction Group Co., Ltd. before. Mario had worked as a worker in Donghai Construction Group from 1980 to 1998, no matter day and night or being exposed to wind and rain, Mario took all mind and body to work and study hardly, so when Mario was in Donghai Construction Group, he had been the most excellent construction engineer even as a normal worker at first.
At the 1998, Mario gave up the comfortable job in Donghai Construction Group and founded the Ningbo Luowen Formwork Co., Ltd. at the first, Luowen Formwork Company had only 3000 square meters factory and 25 workers, Mario was not only the founder, but also the designer,technicist,production supervisor and sales manager, and this was just the rudiment of Luowen Group.
At the 2005, Ningbo Luowen Formwork Co., Ltd. had built its new factory which is of 42 000 square meters area, there are more than 400 employees including professional research and development team,production team,market team and installing team.
Also at the 2005, Ningbo Luowen Formwork Co., Ltd. decided to develop the international market of formwork, and establish the international department immediately, the first sales team included 3 sales then.
From 2005 to 2011, Ningbo Luowen Formwork Co., Ltd. had purchased most stocks of 5 formwork factory in China, and established Ningbo Luowen Group Co., Ltd. the head office is in the South Business District where is the biggest and most modern district in Ningbo city.
Ningbo Luowen Group Co., Ltd. insists the concept of “Market is the most exacting guiding, Customer is the most excellent teacher, quality is the most solid base, Credit is the most effective ensures!” We hope and try best to establish friendly and longtime cooperation with more and more customers all over the word.