Steel lab fume cupboard/ducted fume cupboards/exhausted fume cupboard
USD $200 - $1,000 /Set
Min.Order:1 Set
Guangzhou Boka Lab System Tech. Co., Ltd.
Fume cupboard are widely used in the laobratoryenvironment.A fume hood is an engineered control device to protect the user from hazardous effects of substances
Laboratory fume hood details
Product Name | Steel lab fume cupboard/ducted fume cupboards/exhausted fume cupboard |
Dimension | 1200/1500/1800*800*2350mm |
Color | Customer optional |
Frame structure | standard 60 ×40 ×1.5mm square steel tube spraying epoxy powder coating. other request by customer is available. |
Cabinet body | using 1.0mm minimum thickness of cold-rolled steel ,coated with special chemical resistant epoxy sandblast powder coat for improved corrosion resistance. |
Worktop | epoxy resin/phenolic resin/stainless steel/granite/marble for your option . |
Inner Liner | constructed from compact laminate .it is a high temperature and high pressure decorative plates,waterproof,resistant to moisture,resistant to impact,abrasion,acidcorrosion,heatresistance,it can prevent the accumulation of contaminants and keep gas,mist flow discharge. |
Baffle | made of compact ntrol the direction of air flow ,reduce reflux or whirlpool. |
Sash | the sash slides smoothly in a vertical manner.It is made of at least 6mm thick clear tempered glass to protect the user while providing excellent visibility. |
Lighting | with no less than 300 Lux 30W fluorescent lamp |
Control Panel | used to control the start and stop of the fume hood,LCDdisplay,can be manually controlled to fan,light and volume. |
Accessory | water faucet and sink,gas valve,electric socket and others is available. |
Laboratory fume hood Tecinical data:
1) Operation cabinet door opening height :0-800 mm
2) Face wind speed :0.4-0 .6 m / s.
3) Noise: <60db
4) exhaust volume :1080-1700m3 / h
5) Working voltage: AC220V-380V
6) Motor power :0.09-4kw
Laboratory fume hood ventilation system
Lab supply air is engineered to meet designed air changes per hour.Good sash management is critical to a balanced and efficient lab system.Lab exhaust air is filtered by a carbon HEPA filter module to remove 99.99% of fumes and contaminates.Exhaust is next processed by the tubular centrifugal fan and safely propelled away from the building.
Loading Port | GuangZhou,ShenZhen,any port nominated by customer. |
Delivery Terms | EXW,FOB,CIF,CFR |
MOQ | 1set |
Delivery Period | 7-20days |
Package | Bubble Film+Hard carton for FCL order.Bubble film+carton+wooden case for LCL order. |
Payment | T/T,L/C,Western Union |
Sample | material sample for free,lab furniture sample need to pay. |
Contact information | Email:bokalabsystem.international#("#"="@") Mobile:0086 15899568868 Skype:bokalabinternational Contact Person:Debbie |