Plastic HDPE Large Hollow Winding Pipe Machine SKRG-800
USD $100,000 - $115,000 /Set
Min.Order:1 Set
Qingdao Deyili Plastic Machinery Co., Ltd.
Brief Introduction of Plastic HDPE Large Hollow Winding Pipe Machine SKRG-800
Plastic HDPE large diameter hollow wall winding pipes have been recognized as a substitute for cement pipes
and cast iron pipes since it possesses many particular advantages. HDPE large diameter hollow pipes have big
market potentiality.
Features:
The line adopts two sets of single-screw extruders to ensure high speed and quality extruding;
Unique design of composite die-head and forming by spiral rotation ensure high efficiency and quality;
Advanced PLC Control system makes operation very convenient and operation very efficient;
DEYILI's special pipe fittings are adopted and connection is very convenient.
Models:
Model | Pipe Range | ExtruderModel | Power | Max. capacity |
SKRG-800 | 200-800 | SJ60*34 | 210kw | 400kg/h |
SGRG-1200 | 300-1200 | SJ80*34 | 320kw | 550kg/h |
SKRG-1600 | 800-1600 | SJ100*34 | 400kw | 650kg/h |
SKRG-2200 | 1200-2200 | SJ100*34 | 420kw | 700kg/h |
SKRG-2600 | 1400-2600 | SJ120*34 | 490kw | 850kg/h |
SKRG-3000 | 1800-3000 | SJ120*34 | 540kw | 900kg/h |
Packaging | Standard sea-worthy package mainly with wooden pallet and film coverage for the main machine body; wooden cases for electrical parts & consumable parts. In 2 40' containers. |
1 | Customize Design: Special design for every customer’s actual needs |
2 | Guarantee of quality: One year guarantee of quality for line under correct operation. |
3 | Documents supply: Mechanical and electrical operation manual, Electrical connection drawing(1)and Operation technique manual(1). |
4 | After-sales service provided: Engineers team available to service machine overseas. |
5 | Machine maintenance: Machine lifelong maintenance while troublesome happens. |
6 | Upgrade: Free production software upgrading production formula, process technology and machine structure improves, etc. |
Located in International Airport Industrial Zone, Qingdao Deyili Plastic Machinery Co., Ltd. A hi-tech
enterprise specialized in researching, developing, and manufacturing plastic extrusion equipment. It was
entitled Enterprise of New Technology&Materials of Ministry of Construction, Qingdao Top Ten Hi-
tech Enterprise, and Experimental Unit of Technology Venture Capital.
We are mainly exporting to Russia, Turkey, Iran, Ukraine, Uzbekistan, Finland, Sweden, Austrilia, and
other area of East Europe and mid-east.
Since foundation in 1998, Deyili has been persevering in technology innovation and devoted to R&D and
applications of new machinery, new technology and new technique. We have an excellent technical team
and keeps close cooperation with many technology institute and universities.
At present, Deyili owns 28 National Patents, 14 items supplied domestic gap and 6 items are National
Key Products. We take the lead in development and updating of our key products, which reached the
highest technical level in China.
Deyili passed certifications of ISO9001 and CE. According to criteria of modern enterprises, we are
making great efforts to carry out effective management from production, supply, quality, technique, to
services. Deyili has won wide recognition from domestic and overseas customers by high quality
products and service.
After years of exploration, the enterprise has been enlarged and strengthened continuously. Now it has
become a group which widened its businesses from one fold plastic machinery to production of plastic
pipes and pipe-fittings. Deyili can provide more integrated solutions and all-around services to customers
from extrusion lines to technique and materials.
Payment terms | 30% down payment after signing the contract within 5 workdays, the rest 70% payment after test run in our factory and before shipment. |
Accepting& inspecting in seller's factory | Bring into the agreed time, it is in seller's factory to accept and inspect. The test run will make the pipes under two sides discussion, and promise the machine works in succession for two hours. Other special request, negotiate by two sides. The charge of test materials should be paid by buyer side. |
Installation&test-run in buyer's factory | 1)User should prepare the plant, operators and tools for machine installing, and make the energy available such as water, electricity, materials, work space, labors and so on. 2)Seller send one engineer for direction and supervising the installing, test run and training. The test run will be finished in 15 days if there is other requests please inform in advance. 3)The buyer should pay $100 per day as subsidy for the engineer, and in addition the round airplane tickets, food, hotel fee and insurance of the engineer during the installation and test-run period. |
Documents supply | Mechanical and electrical operation manual(1), Electrical connection drawing(1), And Operation technique manual(1). |
Welcome for your visiting and discuss the details on the technical and process.
The concrete information please write to our sales.