Industrial Carton Flow Steel Rack gravity rolling racking system
USD $50 - $150 /Set
Min.Order:5 Sets
Jinan Jiutong Storage Equipment Co., Ltd.
Industrial Carton Flow Steel Rack gravity rolling racking system
Type | racking syestem |
Material | Cold rolled steel |
Dimension | customized |
Loading capacity | up to 800kg |
mold rack color | customized |
Finishing | Powder coated |
Delivery time | 15 -20 workdays after your deposit |
packed | standard export packing |
application | heavy tooling, die, plastic injection mould,mold |
mold rack features | 1. Drawer side easy to handle and spaces adjustable at ease; 2. With section combination structure, easy to assemble and disassemble 3.Can be equipped with a idler wheel rail on the bottom, easy to pick up and loading 4.Scientific structure, robust, reliable and stable |
It is applied to the production line or assembly line to store materials,and the cases of materials slide along the wheel down by gravity.The design of accessing to material by sliding is more in line with the human body engineering design.
This type of racking is suitable for the storage of large amounts of space using is high.Logistics center,freignt station and publication house and highly automized factories,welcome this type of racking .
Shipping details:
15-20 workdays after deposit recieved
12 days in manufaturing Shipping : Available shipping ways could be applied, by courier, air or sea.
Appointed shipping company or our own forwarders all could be accepted in shipment.
Full-way tracking the cargos for you before the goods arrive
We are one of the most professional manufacturer of warehouse racks in China for more than 10 years. Our customers include distribution centers, manufacturing facilities, large-scale retail and home improvement outlets, industrial warehouses and assembly operations.
FAQ
1.Q: Are you a factory or trading company?
A: We are a factory.We are specilize in all kinds of warehouse storage rack.
2.Q: Where is your factory located? How can I visit there?
A: Our factory is located in Jinan City, Shandong Province, China.You can fly to Jinan airport directly. You are warmly welcome to visit us whenever you are available!
3.Q: What is the raw material of your products?
A: As general, the raw material of steel code is Q235.Other steel is also available to clients’ requirements.
4.Q: What is the term of payment?
A: As general, 30% T/T down payment and balance before shipping.
5.Q: What is delivery times?
A: In general, within 15 -20 workdays .It also depends on the order quantity and racking types.
6.Q: How could I install the racks?
A:We would provide detail install drawing to teach you how to install the racks.
7.Q: Are samples available?
A: Yes. Short sections of samples could be provided, they are free of charge, but international courier costs to be borne by clients.
8.Q: How could you guarantee the products quality?
A: We have professional engineer to check what size should be used to guarantee your load weight request.
Before shipping, our quality control also would carefully check whether the quality is approved
Besides ,please let us know the following information :
1) Size of your warehouse.
2) Width, depth ,height of shelving
3) How many layers you want.
4) Loading capacity of each layer
Looking forward to your any inquiry! ^ v ^