Showy 2016 hot selling Full-weighing stabilized soil mixing station for sale with CE approved
USD $30,000 - $45,000 /Set
Min.Order:1 Set
Zhengzhou Jianxin Machinery Co., Ltd.
Showy CE,ISO HZS50 portable stabilized soil mixing station for sale with CE approved
Exceptional WBZ500 Stabilized Soil Mixing Plant for sale with CE approved
Exceptional 300t/h to 600t/h MWB series Stabilized Soil Mixing Plant for sale with CE approved
Exceptional Modular Type Mobile Concrete Mixing Station YHZS25 for sale with CE approved
Exceptional WCB300 Continuous stabilized soil batching station for sale with CE approved
Features:
1. Adopting double horizontal shaft continuous mixer;
2. With the electronic scale to measure;
3. Equipped with industrial computer for automatic control and it can be operated manually or automatically;
4. The modular structure facilities the installation of transportation;
5. The batching plant is equipped with electronic belt scale and electronic screw scale;
6. The water supply system adopts turbine flow transducer;
7. Can realize the containerized transport.
Advantages:
1. 30 years OEM experience.
2. High quality and best price
3. Professional suggestions for equipment needs.
4. High reliability
5. Easy operation
We guarantee:
1.Engineers overseas for installation, debugging, operators trainning;
2.Warranty: The warranty period shall be 12 months
3.Providing documents needed, like certificate of origin, commercial invoice.
4.Spare parts supply freely;
5.Maintanence:
A. train your operator to operate correctly;
B. send you operation manual to help you operate machine properly and solve common problem
C. Call us at any time if you have problems
D. we will send engineers to your site to solve problems, if needed.
Installation of stabilized soil mixing plant
1,Installation
Installation site should be plain and wellgrounded. The pithead should be higher than ground to prevent the water inflow.
Lift the mixer with lifting device, and install four supporting legs, connecting angle, inclined strut, ladder and the downward track. Then place the mixer in the appropriate place of the pit.
2,Inspection and preparation before test run:
Check if the connection of the motor and electric element is steady.
Check the connecting bolts between two parts (especially the moving parts) and ensure they are firm
Check if there are sundries stuck in mixing canister and track rack.
3,No-load test run
Start mixing motor. At the same time, the running direction of two mixing shafts should be same with indicating direction of the signs . If there is any difference, change the power connection.
4,Over-load test run
Shut down the discharge door and lift the hopper after feeding. Ensure that the hopper can run steadily and stop on the track freely. If there is slipping, you should put the hopper into the pit bottom then adjust the big nut in brake motor.
Attentions:
When construction on cement stabilized soil ,you should obey the following requirements:
1) The clod must be smashed as much as possible, and the diameter should not be more than 15mm.
2) The batching proportion should be accurate.
3) The cement should be paved evenly during the road-mixing construction.
4) Watering and mixing should be well-proportioned.
5) The base thickness and elevation should be controlled strictly and the camber slope should be consistent with the surface.
6) When the mixture is at or slightly larger than the optimum water content (it can be 1%-2% larger on hot days ), compact until it reaches the lowest compaction degree confirmed by heavy compaction experiment.
Factory Show:
1.20GP, 40 HQ standards exporting package, easily damaged part use sturdy wooden case and cartons packing.
Other parts are in nude or customized.
2.Delivery: 7-15 after receiving of down payment.
Customers' Visiting Pictures:
Exhibition Part:
Factory Site Visiting Part:
1Our Egypt customers came to visit us on March 13th,2016.And our engineers Alex Wang gave a detailed description to him and we talked deeply on the stabilized soil mixing station for his project.We offered WBZ500T standard stabilized soil mixing station with 5% discount finally.He placed the order after he went back to his country in April 20th,2016.We will continue to cooperate on other projects.
2Our Bulgaria customers told us that the 300T stabilized soil mixing station he bought has been in using process.It operate well and helped him to save a lot of labour cost compare to his previous projects.
Contact with us at any time if you have any needs for the 300t-600t stabilized soil mixing station for your construction project in the near future!