30 Ton Forklift Heavy Duty Truck
USD $100,000 - $180,000 /Set
Min.Order:1 Set
30 Ton Forklift Heavy Duty Truck
1.Applications:
The CPCD300 offers a new design in combination with improved economics and unmatched performance.
2.Specification
Specification | Unit | Parameter | |
Model | CPCD300 | ||
Power Type/Model | Diesel | ||
Rated Capacity | kg | 30000 | |
Load Center | mm | 1250 | |
Lift Height | mm | 4000 | |
Fork Size(LxWxT) | mm | 2200×310×100 | |
Fork Spread(outside)(Min./Max.) | mm | 1030/2640 | |
Mast Tilt Angle(F/R) | deg | 6·/10 | |
Fork Overhang | mm | 950 | |
Overall Dimensions | Length without forks | mm | 6900 |
Overall Width | mm | 3200 | |
Mast Lowered Height | mm | 3810 | |
Overhead Guard Height | mm | 3700 | |
Outer turning Radius | mm | 6480 | |
Speed(Unload/Load) | Travel | km/h | 30/26 |
Lifting | mm/s | 300 | |
Max.gradeability(Load) | % | 20 | |
Max.drawbar pull(Load) | KN | 200 | |
Service Weight | kg | 35000 | |
Tire | Front | 4×14.00-24-28PR | |
Rear | 2×14.00-24-28PR | ||
Tread | Front | mm | 2300 |
Rear | mm | 2150 | |
Wheelbase | mm | 4800 | |
Ground Clearance(Under mast) | mm | 320 | |
Battery | Voltage/Capacity(5HR) | VA/h | 24V/150 |
Engine | Model | WD615G | |
Manufacture | WEICHAI | ||
Rated Output | Kw | 175 | |
Rated Torque | N.m | 2200 | |
No.Of Cyinder | 6 | ||
Bore*stroke | mm | 120/130 | |
Displacement | L | 9.726 | |
Transmissions | Manufacture | Z160 | |
Type | Fluid | ||
Torque Converter | |||
Stage FWD/RVS | 2/1 | ||
Operating Pressute | Mpa | 21 |
1. Company Advantage
More than ten years of developing and producing experience in heavy duty forklift,expecially stone an d mining specilized model, which require more durability under bad and overload conditions.
We have very professional experience in studying and producing heavy duty forklift (7-30tons) for stone,mine industries.
2.Key parts:
We apply the high standards power model and global key parts to guarantee the total performance even in sever conditions.
Example shows:
1.Productions
2.The truck before shipping out:
3.The truck port loading: