hydraulic master pin press
USD $3,000 - $5,000 /Piece
Min.Order:1 Piece
Xiamen Globe Truth (GT) Industries Co., Ltd.
The Disassembly of Pin Axle First,remove the front track and back one of the pin axle that you want to disassembly respectively.Then install the installing stand in the screw of chain now it is ok,to disassemble the pin axle with hydraulic power | The assembly of Pin Sleeve (chain) Put pin sleeve(chain) on the installing stand.Then using the accessories of the machine.you will be able to assembly it. | The Assembly of Pin Axle This is the same method as the disassembly of it. Only by using the accessories of the machine (leading directional axle), you’ll be able to assemble it easily. | The Disassembly of Pin Sleeve (Chain) First, remove the front and back respective one pin axle of the pin sleeve (chain) that you want to disassemble. You’ll get a single-length chain then. Put it on the installing stand secondly. Now using the accessories of the machine, you can disassemble the pin sleeve freely. |
Type | Machine type | Fit for pitch(mm) | MOQ | Fit of machine | Efficiency |
qty | Example of Komatsu | ||||
Manual press link machine N/W:250Kg
| GT150-1 | 175,190 | 1 | PC100,PC200 | 15-20 mins/link section |
GT150-2 | 175,190,203 | 2 | PC100,PC200, PC300 | ||
GT150-3 | 175,190,203,216 | 3 | PC100,PC200, PC300,PC400 | ||
GT200 | 175,190,203,216,228 | 4 | PC100,PC200, PC300,PC400-6 | ||
GT200-1 | Only for 280 | 1 | PC600,D9,D10 | ||
Manual & Electronic press link machine N/W:300Kg
| GT150-1E | 175,190 | 1 | PC100,PC200 | 7-10 mins/link section |
GT150-2E | 175,190,203 | 2 | PC300 | ||
GT150-3E | 175,190,203,216 | 3 | PC100,PC200 | ||
GT200E | 175,190,203,216,228 | 4 | PC100,PC200, PC300,PC400-6 | ||
GT200-1E | Only for 280 | 1 | PC600,D9,D10 |
All the product can be produced by customers require