Single Bay Paint prep station, dust removes preparation station
USD $3,000 - $7,000 /Set
Min.Order:1 Set
Paint prep station
Model: | Prep Station A | Prep Station B |
Inside Dimensions: | 6300(L)× 3450(W) × 2650 (H) mm | 6300(L)× 3450(W) × 2650 (H) mm |
Outside Dimensions: | 7450(L)× 3550(W) × 3100 (H) mm | 7450(L)× 3550(W) × 3100 (H) mm |
Wall Panels: | Back side with 50mm thickness polystyrene insulation(EPS); Front side, left and right side with 0.5mm thickness PVC curtain | Back side with 50mm thickness polystyrene insulation(EPS); Front side, left and right side with 0.5mm thick PVC curtain |
Basement and Floor: | Without, air exhaust from back side wall. | Complete grating floor with 2 pcs ramps outside |
Generator Setting | Aluminum ally frame | |
Intake: | Without, intake air from roof | One double-intake centrifugal fan, capacity:15000cmh, motor:5.5kW, belt drive |
Extract: | One double-intake centrifugal fan, capacity:15000cmh, motor:5.5kW, belt drive, manual damper | One double-intake centrifugal fan, capacity:15000cmh, motor:5.5kW, belt drive, manual damper |
Heating | Without | Italy RIELLO G10 oil burner, heat capacity: 100000Kcal/h |
Filter System: | Prefilter, ceiling filter, fibreglass filter | Prefilter, ceiling filter, fibreglass filter |
Lighting: | 8 units 4×36W horizontal ceiling lights, Philips tubes, IIlumination≥800Lux | 8 units 4×36W horizontal ceiling lights, Philips tubes, IIlumination≥800Lux |
Control System: | Lighting switch, hours meter, emergency stop. | Lighting switch, hours meter, emergency stop. |
Roof installation type | Steel cable hanging or post supporting | Steel cable hanging or post supporting |
Total Power: | 7KW | 12.5KW |
Note: Any other special designs are available on request.
More Photos for Prep Station