ZAP-S120 twin-shaft bitumen mixer
USD $200,000 - $300,000 /Set
Min.Order:1 Set
Henan ZOOMLINE Machinery Co., Ltd.
1.Capacity:40t-320t/h
2.15 months warranty
3.ISO,CE,GOST
Professional construction machinery manufacturer for Asphalt Mixing Plant
Henan Zoomline Machinery Co., Ltd is a professional construction machinery manufacturer for Asphalt Mixing Plant.
The Company has three main groups
---Batch Asphalt Mxing Plant
---Drum Asphalt Mxing Plant
---Mobile Asphalt Mxing Plant
ZAP-S120 Twin-shaft Bitumen Mixer Configuration:
1. Cold aggregate supply system
2. Drying system
3. Burning system
4. Dust collection system
5. Mixing tower system
6. Electrical apparatus control system
Cold aggregate supply system, adopt frequency control speed
Each cold feed bin is equipped with the feeding belt and sound-light alarm device, when aggregate conveying capacity below the lower limit or suddenly lack of material, the device will alarm immediately to notify the operator handle in time. The door of the cold feed bin can be appropriate adjustment to meet the requirement of the aggregate configuration
Drying system, automatic rotation, sufficient heat exchange
The drying drum welded together by steel plate. After being thrown into drying drum, the aggregate goes into the special design blade, which makes the material falling uniformly like the “aggregate curtain”, so that the aggregate can make sufficient heat exchange with the hot smoke produced by the burner. There special thermal protection blade in the flame burning zone will ensure no “aggregate curtain” in this zone, make sure the flame fully burning, and form a protection layer between the blame and the internal wall of the drying drum in order to reduce the heat loss.
Burning system, high combustion efficiency, high temperature
The burner control system in the control room can conduct remote automatic ignition and monitoring the working condition of the burner. The control system is equipped with failure automatic flame out, failure automatic diagnostics and failure inspection instruction device which make the whole combustion system works safely and reliably.
Dust collection system, environmental friendly, emission concentration is less than 20mg/Nm3
The bag of the bag house filter adopts high temperature resistant material, which can withstand 220°C high temperature. All the bags mouths are equipped with spring buckle, combing with the special bag support frame, to make sure the installation of the bag quickly and reliably.
Mixing tower system, three-dimensional mixing to achieve world-class level
The mixing tower adopts high position design (two discharge method: discharging the mixed material into material mover, then discharging into the mixed material storage silo; discharging the mixed material directly into the truck from the bottom of the mixing tower or the mixed material storage silo.
Electrical apparatus control system
Fully computerized system has the power control, cold aggregate automatically supplying control and automatic control in the mixing process as well as the function of data monitoring in the production process, CORRECTIVE MAINTENANCE and failure warning and the production date report storage and printing. The operator can control and manage the production of the mixing equipment by computer keyboard.
The equipment is designed according to standard high cabinet container, suitable for the construction requirement in both home and abroad. All the components can put into the container, can greatly reduce transport cost. No foundation and modular design, can induce the install and disassembly time to the shortest.
Construction Site:
ZAP-S120 Twin-shaft Bitumen Mixer Detailed Specifications:
Item | Parameter | Remark |
Capacity | 120t/h | Rated condition |
Cold aggregate bin | 4 |
|
Feeding hopper oversize screen | Four sets, mesh 100mmx100mm |
|
Dry drum | Diameter: 1750mm×8m, capacity: 130t/h | Chain drive, with insulating layer outside, with stainless steel |
Burner | Diesel/heavy oil | Coal burner is optional |
Dust collection system | Bag house dust collection system | Water dust collection is optional |
Mineral powder supply system | 30m³ mineral powder hopper(PHE is optional) | Tank top dust catcher |
Mix tower | Four deck vibration screen |
|
Double shaft double helix forced mixer |
| |
3 points pulling electronic weighting sensor, aggregate: 1500kg, powder: 250kg, bitumen: 150kg
|
| |
Control system | One set |
|
Bitumen heating supply system | 400000 kcal thermal oil furnace | |
40000L horizontal bitumen tank(direct hest), bitumen conveying system |
| |
Fuel oil supply system | Heavy oil, diesel pump system one set, 20000L heavy oil tank |
|
Finished product storage bin | Finished product storage bin, electrical/gas path system one set, discharging cross-bars body heat conduction oil heating(electrical heating)
| Optional |