Industry Automatic Oil and Gas Boiler
USD $11,000 - $52,000 /Set
Min.Order:1 Set
Zhangjiagang Wilford Thermal Co., Ltd.
Industry Automatic Oil and Gas Boiler
Simple introduce
1.It uses the most mature three-pass all wet back structure in the world, which safe and reliable.
2.The use of waveform furnace can strengthen disturbance of smoke, increasing the heat transfer area of radiation.
3.The entire heating surface is in symmetrical arrangement with strong structure and reasonable system of water cycle.
4.The water capacity in steam drum is large, with large steam room and quality steam.
5.The unique setting of hearth and scouring way of smoke surface reduce the boiler heat loss to be minimal.
Technical parameters
Type | WNS0.5-0.7-Y.Q | WNS1-1.0-Y.Q | WNS2-1.0-Y.Q | WNS3-1.0-Y.Q | WNS4-1.25-Y.Q | WNS6-1.25-Y.Q | ||
Project | Unit | |||||||
Rated evaporation | t/h | 0.5 | 1 | 2 | 3 | 4 | 6 | |
Rated working pressure | MPa | 0.7 | 1.0 | 1.0 | 1.0 | 1.25 | 1.25 | |
Staturated steam temperature | 170 | 184 | 184 | 184 | 193 | 193 | ||
Fuel consumption | Light diesel oil | kg/h | 32.5 | 65 | 130 | 195 | 260 | 390 |
Natural gas | Nm3/h | 35 | 70 | 140 | 210 | 280 | 420 | |
Liquefied gas | Nm3/h | 15 | 30 | 60 | 90 | 120 | 180 | |
Pipeline gas | Nm3/h | 85 | 170 | 340 | 510 | 680 | 1020 | |
Infall caliber | DN | 25 | 25 | 40 | 40 | 50 | 50 | |
Main valve caliber | DN | 40 | 65 | 80 | 80 | 100 | 125 | |
Safty valve caliber | DN | 40 | 50 | 40×2 | 40×2 | 50×2 | 40/80 | |
Sewage valve caliber | DN | 40 | 40 | 50 | 50 | 50 | 65 | |
Overall size | Length | mm | 3500 | 3900 | 4300 | 4500 | 5000 | 7730 |
Width | mm | 2000 | 2500 | 2700 | 2850 | 3000 | 3490 | |
Hight | mm | 2150 | 2300 | 2500 | 2980 | 3200 | 3560 | |
Weight | kg | 3300 | 4600 | 7100 | 9200 | 11000 | 19200 |
Original Manufacturer
Zhangjiagang Wilford is a professional manufacturer which has the national class B boiler manufacturing license. It produces boilers exactly according to the quality management system ISO9000.
Main Customer
Our products are exported all over the word,like Southeast Asia, Middle East,Russia,Africa,South America.etc
Installation and Training
Our company also will be free charge of training for operation and maintenance of boiler.If needs staff to do test,we will send a engineer,buyer should provide ticket & hotel and arrange for egineer,and pay for USD50 as subsidies per day.Or according to the contract .
After-sale service
1.1-year warranty with full life after-sale services
2.Powerful technical support and services
3.Different voltage available
4.Fast respond with 10 minutes
5.Good after-sale service offered
6.Create you long-term profits
Boiler Package
1.Delivery and Installation
The usually delivery time 15-30 working days, it is depend on your requires .
For the installation, we can send engineer oversea to help.
2.Packaging : we use the plywood case to package the steam boiler.