Chinese beef burger production line/chicken burger machine on Christmas discount
USD $3,800 - $4,000 /Set
Min.Order:1 Set
Jinan Guanyuan Machinery & Equipment Co., Ltd.
Hamburger/Burger Forming Making Machine/Equipment/Production Line
1. Description:
1. The machine adopts meat sauce as main materials.
2.We can get different shapes: round, triangle, square, long, and bone shape and so on.
2. Products: Variety shapes are available for triangle, square tube, round tube by adjusting the mould in the shaper.
3. Capacity: 100-200kg/h,400-600kg/h,600-1000kg/h.
4.Voltage in China: Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers’
Local voltage according to different countries.
5.Machines Materials: All the machines are made by 304 stainless steel.
6.Flow Chart: Forming System----Battering System----Breading System-----Fryer
7.Technical Parameters:
Model | Input Voltage | Installed Capacity | Power Consumption | Output | Size |
GY-100 | 380v/50hz | 12kw | 9kw | 100-200kg/h | 6x0.8x1.7m |
GY-400 | 380v/50hz | 22kw | 18kw | 400-600kg/h | 14x1.1x2.3m |
GY-600 | 380v/50hz | 32kw | 20kw | 600-1000kg/h | 17x1.2x2.7m |
8.Pictures:
a:machine pictures:
b:sample picture and mold pictures:
c:our company honor:
d: our company store:
9:Service:
a.) Consultation service before, during, and after sales;
b.) Project planning and design services;
c.) Debugging of equipment until everything is functional;
d.) Management of equipments' long distance shipping from seller's factory to named place by buyer;
e.) Training of equipment maintenance and operating personally;
d.) New production techniques and formulas;
e.) Provide 1 year complete warranty and life-time maintenance service.
10.FAQ:
Q1: what is your company after-sale service?
Our service is turn-key mode ,which include installment debugging and train
Our engineers available to service machine overseas .
We can free supply the basic formula of raw materials.
Q2: If machines wearable parts need to change, what should we do?
we can offer the wearable parts all the time ,and offer video
Q3: What is the payment terms if we want to buy the machines?
L/C T/T 30% down payment ,70% balance before delivery
Welcome to Inquiry and Visit Our Factory!!!