steam output auxiliary packaging boiler machine
USD $13,000 - $52,000 /Set
Min.Order:1 Set
Zhangjiagang Wilford Thermal Co., Ltd.
steam output auxiliary packaging boiler machine
1.Steam Boiler - Original Manufacturer
Zhangjiagang Wilford is a professional manufacturer which has the national class B boiler manufacturing license. It produces boilers exactly according to the quality management system ISO9000.
2.Steam Boiler-Production Experience
Wilford Thermal has more than ten years production experience and has new progress in Environmental Protection Industry. Our products,like electrical steam boilers,Oil&Gas fired steam boilers,have awards of Suzhou named brand product
3.Steam boiler-Simple introduction
1.Boiler Capacity: 0.5-4Ton/hr
2.Rated working pressure: 0.7-12.5Mpa Can be adjusted according to customer’s demand
3.Fuel: Diesel Oil & Natural Gas & Pipe Gas & LPG
4.Thermal Efficiency: ≥90%
5.Power Supply: Three phase 380V, 50Hz Can be adjusted to 400 Volt or 415 Volt and adjusted to 60Hz
6.Saturated steam temperature: 170-193°C
Type | WNS0.5-0.7-Y.Q | WNS1-1.0-Y.Q | WNS2-1.0-Y.Q | WNS3-1.0-Y.Q | WNS4-1.25-Y.Q | WNS6-1.25-Y.Q | ||
Project | Unit | |||||||
Rated evaporation | t/h | 0.5 | 1 | 2 | 3 | 4 | 6 | |
Rated working pressure | MPa | 0.7 | 1.0 | 1.0 | 1.0 | 1.25 | 1.25 | |
Staturated steam temperature | 170 | 184 | 184 | 184 | 193 | 193 | ||
Fuel consumption | Light diesel oil | kg/h | 32.5 | 65 | 130 | 195 | 260 | 390 |
Natural gas | Nm3/h | 35 | 70 | 140 | 210 | 280 | 420 | |
Liquefied gas | Nm3/h | 15 | 30 | 60 | 90 | 120 | 180 | |
Pipeline gas | Nm3/h | 85 | 170 | 340 | 510 | 680 | 1020 | |
Infall caliber | DN | 25 | 25 | 40 | 40 | 50 | 50 | |
Main valve caliber | DN | 40 | 65 | 80 | 80 | 100 | 125 | |
Safty valve caliber | DN | 40 | 50 | 40×2 | 40×2 | 50×2 | 40/80 | |
Sewage valve caliber | DN | 40 | 40 | 50 | 50 | 50 | 65 | |
Overall size | Length | mm | 3500 | 3900 | 4300 | 4500 | 5000 | 7730 |
Width | mm | 2000 | 2500 | 2700 | 2850 | 3000 | 3490 | |
Hight | mm | 2150 | 2300 | 2500 | 2980 | 3200 | 3560 | |
Weight | kg | 3300 | 4600 | 7100 | 9200 | 11000 | 19200 |
4.Steam boiler-pictures
5.Steam boiler-Factory
6-Steam Boiler house
1)Built a steam boiler house.
2)Preparing piping as steam boiler technical data.
3)Preparing electricity as required.
4)Installed steam boiler as manual.
5)Commissioning steam boiler as manual.
6)Operating steam boiler.
7- Installation and Training
Our company also will be free charge of training for operation and maintenance of boiler.If needs staff to do test,we will send a engineer,buyer should provide ticket & hotel and arrange for egineer,and pay for USD50 as subsidies per day.Or according to the contract .
8-Contact information