Stainless Steel Towing Cable 7x19
USD $850 - $1,200 /Ton
Min.Order:1 Ton
Xinghua City Tianli Stainless Steel Products Co., Ltd.
Type | Stainless Steel Wire Rope |
Material | AISI 304 |
Grade | 201,202,301,302,303,304,304L,316,316L,430,420,310S etc |
Standard | AISI,ASTM,EN,BS,GB,DIN,JIS,etc |
Surface | Polished,Acid,Black,Picked |
Diameter | 0.4mm-40mm |
Construction | 1x7,1x19,1x37,6x7,6x19,6x36,6x37,7x7,7x19,7x36,7x37 etc |
Core | IWR,IWS,FC,SF,NF |
Length | 200m/reel,305m/reel,500m/reel,1000m/reel,1500m/reel,Any size,According to customers' requirement |
Secondary or not | 100% new,non-secondary |
Packing | Wrapped in plastic reel/coil/spool then put on pallets or in wooden/carton box or according to customers' requirement |
Payment Terms | T/T or L/C etc |
Loading Port | Shanghai China |
Delivery Term | EXW,FOB,CFR,CIF |
Quality Assurance | Mill Test Certificate is supplied with shipment,Third party inspection is acceptable |
MOQ | 1 ton |
Delivery Time | Normally within 10 days after receiving deposit or according to customers quantity |
Certification | ISO,SGS etc |
Technique | Hot/Cold Rolled |
Twist Dirction | RHOL,RHLL.LHOL.LHLL |
Condition | Soft wire,semi-soft wire,hard wire |
Nominal Tensile Strength(Mpa) | 1570,1670,1770,1870Mpa |
Main products: Stainless steel wire rope, galvanized steel wire rope,PVC,PE,Nylon coated steel ripe,Stainless steel wire,spring wire,piano wire
Xinhua City Tianli Steel Product Co., Ltd is specialized in producing high quality stainless steel wire, stainless steel wire rope, and PVC/Nylon/PE coated stainless steel wire products. We provide worldwide customers with high quality product, the best price and services.
Workshop:
About us :
(1)The most powerful stainless steel wire rope manufacturer in Jiangsu Province,China
(2)More than 15 years' manufacture and export experience.
(3) 80% products are sold to Europe and America.
(4)Electro Polishing and Annealing can be finished perfectly.
(5)Pay more attention on every details.
Terms:
1) Loading Port:Shanghai.
2) Delivery term:FOB,CFR, CIF
3) Delivery lead time: 10 working days after received deposit.
4) Payment term:30% by T/T as deposit., balance will be paid by T/T ,
5) Quality assurance:Mill Test Certificate is supplied with shipment, third Party Inspection is acceptable
If you have the related procurement demand or plan, welcome to contact me!