Chlorine dioxide generator for water sterilization equipment
USD $980 - $5,600 /Set
Min.Order:1 Set
Qingdao Yimei Environment Project Co., Ltd.
Chlorine dioxide generator for water sterilization equipment
A, summarize:
1, product features and main purposes:
YM series chlorine dioxide generator is my company in the thorough study of domestic and foreign similar products based on advanced technologies, after many years of exploration, innovation and practice, using the latest techniques and special high quality materials developed by. This product has advanced technology, operation convenience, easy maintenance, low operating cost, service life long, the comprehensive performance marked characteristics in the domestic leading level. This equipment is widely used in drinking water, swimming pools, water, hospital wastewater disinfection; Industrial cooling water sterilization alga; Industrial wastewater decoloring, deodorant and remove reducing pollutants.
2.Specifications and types of composition and representing significance:
Generator per hour of equipment specification according to the chlorine-antiseptic yield (g/h) to differentiate, for example: YM - 1,000 refers to economical series products, rated asia-pacific forum every hour for 1000 grams chlorine-antiseptic yield.
3. environment of use and working conditions:
Setting place: indoor (well ventilated)
With water: 25, hydraulic pipe diameter DN p 0.2-0.4 MPa, : traffic Q p 2 cubic meters/hour.
With power: AC220V, 50HZ; Power 1KW
B. the structure and working principle:
1.The overall structure and working principle:
Overall structure: generator have material feeding system and reaction system, absorption system and safety system structure. Generator shell for PVC material.
Working principle: sodium chlorate aqueous solution with hydrochloric acid by negative pressure conditions in the feeding tube material box, dripping with valve into reaction chamber, fully and reaction, output by chlorine dioxide gas for the main ingredients of disinfection, via water absorption and water shoot fully mixing is formed after disinfection, access to water was disinfected.
2.Equipment parts schemes and illustration:
Serial parts function
number name
1 level gauge shows raw material box level
2 drops add valve adjusting raw material dosing quantity
3 raw material dosing valves open or turn off the raw material, KaiTingJi when used
4 suck feed tube add sodium chlorate solution and hydrochloric acid solution to use
5 unicom valve material box, absorb charge absorb charge open when end closure
6 exhaust valve material box, absorb charge absorb charge when closed end to open
7 the outlet check back exports and prevent water chlorine into equipment inside
8 the outlet valve absorb charge only in raw material box when closed
9 drain valve when cleaning of the residual liquid discharge reactor
10 discharging valve row materials. In the box net materials
11 the relief valve equipment operation not the specific pressure at approach
12 water mouth water heating tanks mouth
13 outfall heating tanks drain
14 heating window
15 inlet equipment in operation of air passages
C.equipment installation
(a) installation conditions
1, equipment should be installed in the interior, avoid direct sunlight, equipment working environment temperature request 5 °C to 40 °C.
2, because strong corrosive chlorine, so in choosing equipment installation position with other electric equipment should be avoided in the same room, should be established separately between devices.
3 . equipment should be laid between the ground cement floors, and is equipped with flush water and drainage sewer.
4, equipment should be well ventilated, between because of chlorine dioxide gas, so gravity than air should be in the wall installation fan.
5, equipment shall be equipped with pressure water, water supply pipe diameter DN p 25, pressure 0.2 MPa - 0.4 MPa.
Between June and equipment should be necessary lighting facilities and 220V, 5A single-phase three holes one electric outlet.
(b). install procedures and matters needing attention
installation procedures
(1) determining the disinfectant cast overtime and shooting water machine, equipment installation position.
(2) installed water shoot device, and piped to throw some.
(3) will be put to the appropriate location, equipment for the suction shooting water outlet connections with equipment.
(4) installed equipment, and other parts leaks. Check the interface