YMburied sewage treatment system / integration life sewage treatment equipment
YMburied sewage treatment system / integration life sewage treatment equipment
YMburied sewage treatment system / integration life sewage treatment equipment
YMburied sewage treatment system / integration life sewage treatment equipment
YMburied sewage treatment system / integration life sewage treatment equipment
YMburied sewage treatment system / integration life sewage treatment equipment

YMburied sewage treatment system / integration life sewage treatment equipment

USD $8,000 - $50,000 /Set

Min.Order:1 Set

Supply Ability:
30 Set / Sets per Month
Port:
QINGDAO
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
YM
Model Number:
YMYT

Qingdao Yimei Environment Project Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Waste Water Treatment Plant ,MBR Sewage Treatment Plant ,Dissoved Air Flotation Machine ,Jet Flow Air Flotation Machine ,Submersible Mixer

Product Details

ETP industrial wastewater treatment plant

YMburied sewage treatment system / integration life sewage treatment equipmentYMburied sewage treatment system / integration life sewage treatment equipment 

I.Advantages:

1.Compact structure,small land occupation.

2.One unit with full components,efficient operation.

3.Combine the nucleus and assistant treatment,with stable water quality.

4.Apply qravity flow,saving power.

5.Simple operation,no professional management.

 

II.Equipment structure:

1. High efficiency biochemistry treating field:apply new type of filler,with large specific surface area,strong adhesive attraction and well attack resistance ability.

2.Settling pond:apply inclind tube settling with high efficiency,small volume of settling pond.

3. Filtering pond:apply light filter material,water power for backwashing,so there is no need of backwashing pump, and it saves electricity.

4. Contact sterilized pond:mixing thimerosal and wastewater to ensure the out water index.

5. All of the system applies integrated treatment as equipment nucleus,assisted pump,blower and thimerosal dosing equipment.

 

III.Design parameters:

Design water treatment discharge 500m3/d

Inlet water quality SS=300mg/L,COD=500mg/L,BOD=300mg/L
Design effluent water quality SS =10mg/L,COD= 50mg/L,BOD =10mg/L,LAS= 2mg/L

 

IV.Explanation:

There are two types of equipment installed:above the ground and underground.

Need average resistance of pressure from foundation,and the foundation must bu standard. If the equipment installed underground,the relatively level of foundation and terrace must same with equipment high. As soon as the equipment perched qualified,it must be filled water avoiding ground water float the equipment.

Before the equipment is used,we must check equipment system device and blower engine oil normal or not,until all of them are qualified.

Then users should establish a suit of timely repair institution,blower cant reversion,timely check the blower engine oil,and clean the blower are inlet mouth regularly,keep the blower clean and repair the pump per 5000h.

 

V.Progress figure:

YMburied sewage treatment system / integration life sewage treatment equipment

 

 

VI.Specifications

YMburied sewage treatment system / integration life sewage treatment equipment

 

Our customers 

YMburied sewage treatment system / integration life sewage treatment equipmentYMburied sewage treatment system / integration life sewage treatment equipment

Contact Supplier

Ms. lin chen manager Chat Now
Telephone
86-532-88180456
Mobile
0086-13853232196
Fax
86-532-88180610
Address
Chang an Road, Jiaonan Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~