High Quality China Supplier Integrated Underground Package sewage treatment unit
USD $3,600 - $38,000 /Set
Min.Order:1 Set
Qingdao Yimei Environment Project Co., Ltd.
Feature:
A. Save a lot of prime city land
Integration pointwise prefabricated underground Sewage Treatment Equipment is the equipment which has all sewage treatment equipment underground. There are only administrative offices and remote operation over the ground. So it is more evident to save the land. We can construct public green land and green landscape to meet the requirements of green space allocation. We can also preserve more open space for city.
| Sewage treatment capacity | ||||
3000t/d | 10000t/d | 30000t/d | 50000t/d | ||
Land area occupied by surface(m2) | Rectangular centralized sewage treatment plant on the ground | 2550-3600 | 8500-12000 | 25500-36000 | 42500-60000 |
Integration prefabricated underground Sewage Treatment | 102-144 | 340-480 | 1020-1440 | 1700-2400 |
B. More flexible form without supporting municipal pipe network
It is no need to construct the municipal pipe network if you use our Integration prefabricated underground Sewage Treatment Equipment is the equipment. It can be put into operate as soon as finished production. However, the traditional sewage treatment plants need to construct a lot of municipal pipe network. It needs long time to construct. And more uncertain disturbances happened during construction. So, it unable to reach full capacity for a very long time. This have greatly extended the payback period and seriously affecting the efficiency of fund use.
The sewage treatment capacity of our equipment is from thousands to ten thousands ton a day. It’s characteristics are small, flexible forms, occupies a small surface area. So it suit for urban residential, industrial and mining, medicine, papermaking and so on.
It is good idea to use our equipment when some special quality or district where the sewage is not easy to be collected by sewage pipe network. To meet the goals of quickly treatment and “ the whole collection, and deal with”.
C. No environmental pollution underground sewage treatment plant help to achieve the goal of “full collection, the whole deal’ .
The goal of Integration pointwise prefabricated underground Sewage Treatment Equipment is the whole collection, the whole process, no open, non-ozone pollution, no noise. It is help to improve the problem of secondary pollution caused by traditional sewage treatment. At the same time, due to the use of point-source layout, it is not only avoid the sewage pipe network construction, but also solve the serious pollution of urban environment and groundwater which caused by the existing sewer leakage.
D.Short construction period
The use of prefabricated modules, sewage plant to shorten the construction period an average of 50%.
| Sewage treatment capacity | ||||||||
3000t/d | 10000t/d | 30000t/d | 50000t/d | ||||||
Rectangular centralized sewage treatment plant on the ground | 12 | 14 | 16 | 18 | |||||
Integration prefabricated underground Sewage Treatment | 6 | 7 | 8 | 9 |
E. Enter water quality for a wide ring, out water quality stability.
According to the enter water quality and out water quality requirements, professional technical engineer for sewage treatment design process to meet the need of various types of waste water treatment, such as industrial waste water, sewage, medical and biological sewage, municipal sewage and so on. The out water quality to meet the Chinese national waste water discharge standards. We can also produce in accordance with customer’s requirements.
Advanced sewage treatment process be used in our equipments. It has strong impact.
F. Automatic control, remote data upload
diagram