Resort hotel underground sewage waste water treatment plant(WWTP)
Resort hotel underground sewage waste water treatment plant(WWTP)

Resort hotel underground sewage waste water treatment plant(WWTP)

USD $9,200 - $29,000 /Set

Min.Order:1 Set

Supply Ability:
10 Set / Sets per Month
Port:
Qingdao
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
YIMEI
Model Number:
YMYT-12m3/d

Qingdao Yimei Environment Project Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Waste Water Treatment Plant ,MBR Sewage Treatment Plant ,Dissoved Air Flotation Machine ,Jet Flow Air Flotation Machine ,Submersible Mixer

Product Details

A. Save a lot of prime city land

 

Integration pointwise prefabricated underground Sewage Treatment Equipment is the equipment which has all sewage treatment equipment underground. There are only administrative offices and remote operation over the ground. So it is more evident to save the land. We can construct public green land and green landscape to meet the requirements of green space allocation. We can also preserve more open space for city.Resort hotel underground sewage waste water treatment plant(WWTP)

 

Sewage treatment capacity

3000t/d

10000t/d

30000t/d

50000t/d

Land area occupied by surface(m2)

Rectangular centralized sewage treatment plant on the ground

2550-3600

8500-12000

25500-36000

42500-60000

Integration prefabricated underground Sewage Treatment

102-144

340-480

1020-1440

1700-2400

 

 

B. More flexible form without supporting municipal pipe network

 

 It is no need to construct the municipal pipe network if you use our Integration prefabricated underground Sewage Treatment Equipment is the equipment. It can be put into operate as soon as finished production. However, the traditional sewage treatment plants need to construct a lot of municipal pipe network. It needs long time to construct. And more uncertain disturbances happened during construction. So, it unable to reach full capacity for a very long time. This have greatly extended the payback period and seriously affecting the efficiency of fund use.

The sewage treatment capacity of our equipment is from thousands to ten thousands ton a day. It’s characteristics are small, flexible forms, occupies a small surface area. So it suit for urban residential, industrial and mining, medicine, papermaking and so on.

It is good idea to use our equipment when some special quality or district where the sewage is not easy to be collected by sewage pipe network. To meet the goals of quickly treatment and “ the whole collection, and deal with”.

 

 

C. No environmental pollution underground sewage treatment plant help to achieve the goal of “full collection, the whole deal’ .

 

The goal of Integration pointwise prefabricated underground Sewage Treatment Equipment is the whole collection, the whole process, no open, non-ozone pollution, no noise. It is help to improve the problem of secondary pollution caused by traditional sewage treatment. At the same time, due to the use of point-source layout, it is not only avoid the sewage pipe network construction, but also solve the serious pollution of urban environment and groundwater which caused by the existing sewer leakage.Resort hotel underground sewage waste water treatment plant(WWTP)

 

 

D.Short construction period

 

The use of prefabricated modules, sewage plant to shorten the construction period an average of 50%.

 

Sewage treatment capacity

3000t/d

10000t/d

30000t/d

50000t/d

Rectangular centralized sewage treatment plant on the ground

12

14

16

18

Integration prefabricated underground Sewage Treatment

6

7

8

9

 

 

E. Enter water quality for a wide ring, out water quality stability.

 

According to the enter water quality and out water quality requirements, professional technical engineer for sewage treatment design process to meet the need of various types of waste water treatment, such as industrial waste water, sewage, medical and biological sewage, municipal sewage and so on. The out water quality to meet the Chinese national waste water discharge standards. We can also produce in accordance with customer’s requirements.

Advanced sewage treatment process be used in our equipments. It has strong impact.

 

 

FAQ

[Q]How to buy your idea products?

[A]You can provide us your water sources, water quality, flow rate and ground area (contact us for more details). 

[Q]What is your payment terms?  

[A]TT and L/C are acceptable and TT will be more appreciated.30% deposit in advance and balance before loading.

[Q]What is the delivery time?

 [A] It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

[Q]How to pack the products?

 [A]We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

[Q]How to keep your equipments from corrosion? 

[A]We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.

[Q]How do you manufacture your equipment ?

[A]Our  machining technology  includes laser/plasma cutting, automatic welding,CNC cutting and bending.

[Q] How to install after the equipments arriving destination? 

[A] We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. Resort hotel underground sewage waste water treatment plant(WWTP)Resort hotel underground sewage waste water treatment plant(WWTP)

Contact Supplier

Ms. lin chen manager Chat Now
Telephone
86-532-88180456
Mobile
0086-13853232196
Fax
86-532-88180610
Address
Chang an Road, Jiaonan Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~