Hospital solid waste Incinerator

Hospital solid waste Incinerator

USD $200 - $65,000 /Set

Min.Order:100 Sets

Supply Ability:
100 Set / Sets per Month
Port:
Qingdao
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
YM
Model Number:
YM

Qingdao Yimei Environment Project Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Waste Water Treatment Plant ,MBR Sewage Treatment Plant ,Dissoved Air Flotation Machine ,Jet Flow Air Flotation Machine ,Submersible Mixer

Product Details

Specifications

Zero failure: low failure rate and cost of maintenance
Easy operation: easy to learn
Easy to burn, energy saving

Hospital solid waste IncineratorLDF series medical solid waste incinerator

LDF series medical waste incineration installation with the characteristic of small size, high efficiency and reasonable incineration, leading technology, higher harmless degree, is the ideal garbage treatment facilities apply to all kinds of hospital, hotel, station.

Main features:

1. The gasifying incineration technology to be applied to the incineration injector, feeding container and other medical equipment as well as different paper slash, bandage, cotton column, different kinds of medical pollutants and various wastes discharged by hospitals and medical organization.

2. The gasifying incineration way is utilized and the rubbished produced each day is able to handle the one-off incineration treatment.

3. The gasifying incineration, mixed incineration, burn-out treatment and other technologies are used to make the content of the smog exhaust and dust lower than the discharge standard regulated by the nation.

4. Fully seal operation is adopted to be applied to dealing with the infectious medical waste and avoid the secondary pollution.

5. Small volume and site area.

6. The series of incinerator are divided into the fuel and gas kind which can be selected according to the different needs of the users.

 

Applicable hospital size

(number of beds)

600-800beds

Burning Ability

300-40kg/ times

(daily incineration3-6 times)

Size of the Burner

3120mm×2100mm×2000mm

 

Volume of the Burner

Gasification room3.5m3,secondary bumingroom1.5m3,drift a long burning a room0.3m3

Size of the filling entrance

1080mm×1280mm

Chimney

Height 14m out-radius 460mm

Blower

Power1.1kw,air quantity 1600m3/h

Ejector fan

Power0.55kw,air quantity 850m3/h

Auxiliary machine

Power 0.185kw,Gas flow min 6m3n/h

max20.6m3n/h

Re-burning machine

Power 0.37kw,Gas flow min 9m3n/h

Max36m3n/h

Running voltage

240v

Weight

About 15000kg

 

 

Hospital solid waste Incinerator

Contact Supplier

Ms. lin chen manager Chat Now
Telephone
86-532-88180456
Mobile
0086-13853232196
Fax
86-532-88180610
Address
Chang an Road, Jiaonan Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~