Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator
Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator
Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator
Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator
Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator
Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator

Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator

USD $5,560 - $5,950 /Set

Min.Order:1 Set

Supply Ability:
200 Set / Sets per Month
Port:
QINGDAO
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
YIMEI
Model Number:
LDF-150

Qingdao Yimei Environment Project Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Waste Water Treatment Plant ,MBR Sewage Treatment Plant ,Dissoved Air Flotation Machine ,Jet Flow Air Flotation Machine ,Submersible Mixer

Product Details

Product Description

Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator

 

LDF-150 medical solid waste incinerator

LDF series medical waste incineration installation with the characteristic of small size, high efficiency and reasonable incineration, leading technology, higher harmless degree, is the ideal garbage treatment facilities apply to all kinds of hospital, hotel, station.

Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator

Main Features:

1. The gasifying incineration technology to be applied to the incineration injector, feeding container and other medical equipment as well as different paper slash, bandage, cotton column, different kinds of medical pollutants and various wastes discharged by hospitals and medical organization.

2. The gasifying incineration way is utilized and the rubbished produced each day is able to handle the one-off incineration treatment.

3. The gasifying incineration, mixed incineration, burn-out treatment and other technologies are used to make the content of the smog exhaust and dust lower than the discharge standard regulated by the nation.

4. Fully seal operation is adopted to be applied to dealing with the infectious medical waste and avoid the secondary pollution.

5. Small volume and site area.

6. The series of incinerator are divided into the fuel and gas kind which can be selected according to the different needs of the users.

LDF-150 Model medical solid waste incinerator 

Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator

Main parameters

Applicable hospital size (number of beds)

300-800 beds

Burning Ability

100-150kg/ time

(3-6 times per day)

Size of the incinerator

2m×1.4m×3.5m

Volume of incinerator

Gasification room1.4m3,secondary burning room 0.7m3

Size of the filling entrance

760mm×960mm

Chimney

Height 15m, out-radius Ø300mm

Air blower

0.5kw

Auxiliary  burner 

Power 0.11kw, oil consumption volume  4-10kg/h

Re-burning burner

power 0.22kw,oil consumption volume 7-14 kg/h

operation voltage

220V or380V

weight

About 7000kg

 

LDF-150 Main configuration list

Equipments name

specification  

quantity

unit

Furnace main body(first burning room)

A3 steel,refractory material

1

set

Auxiliary  burner

power 0.11kw

1

set

Re-burning burner

Power 0.22kw

1

set

secondary burning room

A3 steel,refractory material

1

set

Mixing burning room

 A3 steel,resist high temperature material

1

set

gas fume purify room

 A3 steel,resist high temperature material

1

set

oil storage tank

 Carbon steel plate

1

pc

Grey rake

Ø20mm plate 200mm×200

 

 

air blower

0.5 kw

1

set

ventilate pipe

A3 steel pipe

1

set

chimney

A3 iron pipe,out-radius DN300mm

height 15m

1

set

thermoelectric couple

Resist high temperature 1200°C

1

set

Electronic control system

 

1

set

installation attachment 

 

1

set

Installation manual and video disk

 

1

set

 

LDF-150 packing list 

Item

Size(mm)

Weight

(kg)

Number

First combustion chamber

2400×1700×1600

4500

1

Second combustion chamber

2400×1500×1200

1200

1

Flue gas purification

Ø900×1100

800

1

chimney

Ø300,Height 30m

400

1

fuel tank

Ø800×Ø600

100

1

Fuel tank bracket

4000×Ø600

80

1

Amount:

 

7180

6

Stating: Combustion engine,air blower and install accessories inside the furnace body.

 

Packaging & Shipping

 

Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste IncineratorHospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste IncineratorHospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator

 

Our Services

 Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator

 

 

Company Information

Hospital Garbage Incinerator/Medical Refuses Burning Incinerator Furnace/Solid Waste Incinerator/Hospital Waste Incinerator
 

FAQ

 

[Q]How to buy your idea products?

[A]You can provide us your water sources, water quality, flow rate and ground area (contact us for more details). 

[Q]What is your payment terms?  

[A]TT and L/C are acceptable and TT will be more appreciated.30% deposit in advance and balance before loading.

[Q]What is the delivery time?

 [A] It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

[Q]How to pack the products?

 [A]We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

[Q]How to keep your equipments from corrosion? 

[A]We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.

[Q]How do you manufacture your equipment ?

[A]Our  machining technology  includes laser/plasma cutting, automatic welding,CNC cutting and bending.

[Q] How to install after the equipments arriving destination? 

[A] We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. 

 

Contact Supplier

Ms. lin chen manager Chat Now
Telephone
86-532-88180456
Mobile
0086-13853232196
Fax
86-532-88180610
Address
Chang an Road, Jiaonan Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~