Underground sewage treatment equipment
Underground sewage treatment equipment
Underground sewage treatment equipment

Underground sewage treatment equipment

USD $7,000 - $10,000 /Set

Min.Order:1 Set

Supply Ability:
20 Set / Sets per Month
Port:
Qingdao
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
EPO
Model Number:
YMDM

Qingdao Yimei Environment Project Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Waste Water Treatment Plant ,MBR Sewage Treatment Plant ,Dissoved Air Flotation Machine ,Jet Flow Air Flotation Machine ,Submersible Mixer

Product Details

Specifications

sewage treatment equipment embed under the surface ;
No secondary pollution ;
No impact on the surrounding environment.

Buried integrated domesticsewage treatment equipment1

 

DSW-A equipment scope of application:

 

This underground sewage treatment is suitable for the residential area, hotel, nursing homes, schools, mines, factories and such life organic wastewater treatment anything like industrial organic wastewater treatment.

 

DSW-A equipment description of the process:

DSW - A device is designed for sewage and anything like industrial organic wastewater treatment, its main processing method is used at present the mature biochemical treatment technology, biological contact oxidation, water quality parameters according to general life wastewater design calculation, press BOD5 200mg/l, average 20mg/l according to water BOD5 design. Six parts: (1) (2) beginning pond contact oxidation ponds (3) the second pond (4) disinfection pool, disinfection device (5) sludge pond (6) wind room, fan. Now discussed as follows:

 

1). beginning early: this equipment pond for pond, sewage leaking Kennedy streaming rising velocity in traps 0.6-0.7 mm/SEC, precipitate down with air mention to sludge sewage sludge pond. (note: DSW - A0.5-5m3 / h do not set beginning pond)
2).contact oxidation pool of water after: beginning the sink are analysed to contact pool biochemical treatment, contact pool three levels, total retention time for more than four hours, heavy-duty equipment contact oxidation time can reach 6 hours, packing for novel trapezoidal packing, easy conjunctival, no congestion, packing for 160m2 / m3 than surface area than gas-water contact, pool in 12:1 around. (note: DSW - A0.5-5m3 / h contact pool for level 2)

3). the second pond: the sewage flows into biochemical second pond, the second pond leaking for two vertical flow velocity parallel-running, rise 0.3-0.4 millimeter/SEC, row mud USES air mention to sludge pond. (note A0.5 DSW - 5m3 / h sludge artesian - to sludge pool)
4). sterilization tank and disinfection device: according to the standard: "disinfection pool TJ14 74" standard for 30 minutes, if the hospital sewage, sterilization tank can increase the retention time to 1-1.5 hours. By using solid chlorine slices of dissolved disinfection way, contact with disinfection disinfection pool, according to the size of the device can change constantly, &safe-durable
Variable dosage, achieve much more medicine, less water water less the purpose of dosing, need other device can be made separately.

5). sludge pond: beginning pond, the second pond with all the sludge are DSW - A lift to the air within the sludge pond aerobic digestion, sludge pond with supernatant fluid flowing to contact oxidation in the pool before treatment, digestion, excess sludge rarely after general 1-2 years clean up, cleaning method can be used FenChe absorption from the sludge pond inspection hole stretch into sludge after bottom department for suction can. Sinotrans (DSW - A0.5-5m3 / h sludge using anaerobic digestion)
6). the wind room, fan: equipment DSW - A computer in the wind, the wind above the sterilization tank engine room with double layer sound insulation, 2 imported A muffler, fan filter, so runtime without noise. Fan adopts two L ROM dimitrios blower, it can automatic alternating single machine operation, the fan operation life of 30,000 hours.

 

DSW-A equipment Technoloty Parameters Table:

Name,type

A-0.5

A-1

A-3

A-5

A-10

A-20

A-30

Treatment capacity(m3/h)

0.5

1

3

5

10

20

30

 air blower

type

L13LD

L21LD

L22LD

L23LD

L32LD

power (KW)

0.75

1.5

2.2

4

7.5

water pump

type

ASl0-2CB

ASl6-2CB

power (KW)

1.0

1.6

water inflow

BOD5mg/l

150-400

water yield

BOD5mg/l

20-60

equipment weight (T) approximately

2.5

4.5

6

9

9

12

15

 

DSW - A equipment all facilities are set in A number of the cabinet, made by the A3 steel box, the thickness of the steel plate handled, each box 8mm with seamless steel tube connection, equipment inside and outside all use chemical product promotion chlorosulfonated polyethylene anti-corrosion coatings, equipment general besmear brushs the paint 8 way: 2 coat 6 road face paint, corrosion life generally available for 10 years.
Set of DSW - A design of equipment maintenance cycle for 10 years.

  Underground sewage treatment equipment

 

Underground sewage treatment equipmentUnderground sewage treatment equipmentUnderground sewage treatment equipmentUnderground sewage treatment equipment

Contact Supplier

Ms. lin chen manager Chat Now
Telephone
86-532-88180456
Mobile
0086-13853232196
Fax
86-532-88180610
Address
Chang an Road, Jiaonan Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~