BS1139 gi scaffolding pipe
USD $500 - $650 /Ton
Min.Order:25 Tons
Cangzhou Leadingfly Steel Pipe Co., Ltd.
BS1139 gi scaffolding pipe
Details for BS1139 gi scaffolding pipe
ERW STEEL PIPE---STRAIGHT WELDED STEEL PIPE---Q235 STRAIGHT WELDED STEEL PIPE---Q345 WELDED STEEL PIPE---CANGZHOU LEADINGFLY STEEL PIPE
SIZE: 20MM---2800MM
WT:0.8--24mm
EXECUTIVE STANDARD:ASTM A53-2007,ASTM A135,GB/T3091-2008.
MATERIAL: Q195-Q235,Q345, alloy steel,ST37-2,ST52-3,S235,S275, S355,A500,A106,A53
PACKING: painting, oil outside, steel strip then in Bundle or as per the client PIPE LENGTH:EXPORT LENGTH USUALLY 5.8M,11.8M.THE ACTUAL LENGTH WILL PRODUCE AS CLIENT REQUIREMENT.
PAYMENT:30%T/T IN ADVANCE,70%BALANCE AGAINST THE B/L COPY.OR 100% IRREVOCABLE L/C AT SIGHT.
DELIVERY TIME:15-30 DAYS ACCORDING TO THE GOODS QUANTITY.
APPLICATION AREA:WIDELY USED IN MACHINOFACTURE,CONSTRUCTION INDUSTRY,METALLURGICAL INDUSTRY,AGRICULTURAL VEHICLES, AGRICULTURAL CANOPY,AUTO INDUSTRY,RAILWAY,HIGHWAY GUARDRAIL,CONTAINER SKELETON,FURNITURE,DECORATION AND STEEL STRUCTURE AREA,ETC.
LOOKING FORWARD TO YOUR INQUIRY.
TEL:86-317-5299909
CONTACT PERSON:STACY ZHANG
ERW STEEL PIPE---STRAIGHT WELDED STEEL PIPE---Q235 STRAIGHT WELDED STEEL PIPE---Q345 WELDED STEEL PIPE---CANGZHOU LEADINGFLY STEEL PIPE
Specification for BS1139 gi scaffolding pipe
ERW Steel Pipe | (ERW Longitude Straight Seam Steel Pipe) DIA: 20MM---508MM. |
LSAW Steel Pipe | (Double Submerged Arc Welding Straight Seam Steel Pipe) 20-1420mm |
Double Submerged Arc Butt Welding Steel Pipe | 457mm-2800mm |
Wall thickness | 0.8--24mm, SCH 20,SCH30, SCH40, STD, XS,SCH80, SCH160,XXS ETC |
Standard | BS1387 ,BS 4568 ,BS EN39 ,BS 31 ,BS 3601 ,BS EN10217 ,EN10219,EN10210,JIS G3452-2004 ,JIS G3445-2006 ,JIS G3444-2006,JIS C8305-1999 ASMT A53 ,ASTM A500,GB/T 3091-2008, API 5L,GB/T 13793 BS EN 10296, BS EN 10025, BS EN 10297, BS6323, BS EN10219, ES |
EN 10217,GB/T 13793, GB/T 14291, GB/T 3091,GB/T 3640-88,APL 5LAPI 5CT | |
Steel Grade | Q195-Q235,Q345, alloy steel,ST37-2,ST52-3,S235,S275, S355,A500,A106,A53 |
Packing | Painting, oil outside, steel strip then in Bundle or as per the client |
Length | 2m-----12m |
Delivery time | 10 days after receiving the deposit, some size is available |
Payment item | 30% advance payment, the balance will be against the BL copy |
LC irrevocable at sight, D/P | |
Marketing | South East Asia, Africa, European, South AMERICAN, USA, Australia |
Finish | Galvanization ,bared, oiled, black panting or as per the client's requirement, beveled edges, anti-rust oil and caps on both ends |
Technique | Electronic Resistance Welded (ERW), Electronic Fusion Welded (EFW), |
LSAW(LongSubmerged Arc Welding Straight Seam Steel Pipe) | |
Double Submerged Arc Welded (DSAW), Cold rolled, cold drawn,hot rolled | |
Application | Structural pipe, oil or gas transportation pipe, fluid pipe, line pipe, drill pipe, boiler pipe, etc |
Surface | PP,3PE,FBE, OIL PAINTING, BLACK PAINTING OR AS PER CLIENT'S |
Packing | PP, PE, IN BUNDLE, BLACK PAINTING AND CAPS ON BOTH ENDS, OR AS PER THE CLIENT'S REQUIREMENT |
Certificate | API, ISO9001 |
Port | Tianjin or any port in China |
Picture for BS1139 gi scaffolding pipe
Workflow
Packaging&shipping for carbon steel scaffolding pipe
Customer visiting
Our team
carbon steel scaffolding pipe