Fabricated biological wastewater treatment plant
USD $4,680 - $5,855 /Set
Min.Order:1 Set
Qingdao Yimei Environment Project Co., Ltd.
Manufacture details:
Carbon Steel surface finish and corrosion treatment
1. Sand Blasting/ Shot Peening, ISO Sa≥2.5,epoxy Zinc Rich Primer, 50μm/coat.
2. Internal: a) Epoxy Zinc-rich Primer, 50μm/coat×1;
b) Epoxy Mastic Paint, 100μm/coat×2~3;
c) Total film thickness: ≥250μm.
3. External: a) Epoxy Zinc-rich Primer, 50μm/coat×1;
b) Epoxy Micaceous Iron Intermediate Paint, 50μm/coat×1;
c) Polyurethane Finish, 50μm/coat×1;
d) Total film thickness: ≥150μm.
Spraying Method: High-Pressure Airless Spraying
Device Color: Light Sea Blue (PANTONE No.RAL5015),or according to customers’ demands.
Standards for Interface Flange
China: JB/T81-1994, PN 1.0
America: ANSI 150
Japan: JIS 10K
1. Detailed installation manual and maintenance guideline are provided with the equipment.
2. Technical training and site-commissioning are available for you.
3. Any equipment issue, we will stand by. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
1.Q:Are you a factory or trading company
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ,CE ,ISO,SGS certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.