Containerized Sewage Treatment Plant for Hotel Wastewater
USD $3,500 - $9,560 /Set
Min.Order:1 Set
Qingdao Yimei Environment Project Co., Ltd.
Containerized Sewage Treatment Plant for Hotel Wastewater
Based on the SBR(sequencing batch reactor) technics,our company develop this new kind matched equipment PACKAGE SEWAGE TREATMENT PLANT.It can be widely used for all kinds of sewage treatment plant.The working principle is a kind od biochemical treatment to combining the activated sludge microbiologicalmethod and new biological membrane manner.In treatment process,plenty of microbacteria grow into a biological film in the surface of immobilization and floation carrier.Along with the impact of steam in the sewage,the equipment will update the bacteria and film.When aerating,it will improve the contact efficient of microbacteria and pollutant in the waste water.The equipment will make three environment of anaerobic,anoxia and aerobic by turns,which will impove the clarifying capacity of different microbiota and strengthen the efficacy to remove the organism and denitrification and phosphorus removal.
Our packaged sewage treatment plant can be widely used in the following place.
Our production has ISO9001:2000 & CE certifications.
Qingdao Yimei Environment Project Ltd. is found in 1988.We are located in the largest port city-Qingdao China. Our factary take up 36,000 square metres and there are more than 130 kinds machine for manufacturing. As a member of Shandong Province Environmental Protection Industrial Association, we have 360 staff and 72 experienced engineers.
Our main product is the equipment for Environment Protection and Waste Water Treatment.And the product is popular all over the world,such as Africa, North America,Domestic Market,Eastern Asia,Mid East.
[Q]How to buy your idea products?
[A]You can provide us your water sources, water quality, flow rate and ground area (contact us for more details).
[Q]What is your payment terms?
[A]TT and L/C are acceptable and TT will be more appreciated.30% deposit in advance and balance before loading.
[Q]What is the delivery time?
[A] It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
[Q]How to pack the products?
[A]We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
[Q]How to keep your equipments from corrosion?
[A]We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
[Q]How do you manufacture your equipment ?
[A]Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
[Q] How to install after the equipments arriving destination?
[A] We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you.
If you are interested in our product and company,please do not hesitate to contact us.